Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
03 October 2018 | Story UFS | Photo Varsity Sports
First ever netball final in Bloemfontein
The Kovsies will be aiming to lift the Varsity Netball trophy in front of their home supporters on Monday when they face Tuks in the final in the Callie Human Centre.

The netball team of the University of the Free State, once again after five years, earned themselves the right to stage a final in the Varsity Netball competition. The two-time champion, the Dream Team, qualified for the final after topping the log and then wiping the floor with the Maties on Monday (1 October 2018) in the semi-final. The score was 56-45. 

They will come up against Tuks in the Callie Human Centre on the UFS Bloemfontein Campus for the final tonight. The match will get underway at 18:45.

The team won the very first two years of the competition in 2013 and 2014. On both occasions, they had to play away from home – in 2013 against the Pukke in Potchefstroom and in 2014 against Tuks in Pretoria. 

It will be the fourth meeting between the Kovsies and Tuks within three months. The Free State students won the group fixture in August by 68-43, but Tuks had to do without a number of their star players. At the University Sport South Africa tournament in Bloemfontein during July, Tuks triumphed twice, winning the final by 48-30.

Apart from the winners’ medals, an award will be handed to the tournament’s top player. Centre Khanyisa Chawane is one of three finalists. The winner gets chosen through public votes.

Dream Team players have won the prize four of the five times. Ané Botha was crowned in 2013, Karla Pretorius in 2014 and 2015, and last year it was the turn of current Kovsie player, Khomotso Mamburu.

To vote for Chawane, click here hover your mouse over the like button and choose the heart emoticon. Voting is closing on 5 October and the winner will be announced after the final.

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.

More information, guidelines and contact numbers

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept