Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 April 2019 | Story Leonie Bolleurs
Science ambassadors
Friends Tekano Mbonani and Chaka Mofokeng are pursuing graduate degrees in respectively Physics at the University of the Free State (UFS) and Astronomy at the University of the Western Cape. The two got together and decided to reach out to the high school, Leseding Technical Secondary School, where they came from.

It was a full house as more than 120 learners packed the hall at the Leseding Technical Secondary School in the Free State, where two young Astronomy researchers had come home to tell their younger peers about their studies and career prospects across South Africa.

Chaka Mofokeng and Tekano Mbonani are both former learners at the high school. Currently pursuing graduate degrees – for Mbonani in Physics at the University of the Free State (UFS), and for Mofokeng in Astronomy at the University of the Western Cape – the two friends got together and decided to reach out to the high school where they came from.

The event took place in January before schoolwork, tests, and exam preparations are occupying learners’ minds, inviting them to think about the big picture – the future, and how to be part of it. This is timely, because in July last year, the MeerKAT radio telescope was inaugurated in the Karoo. The MeerKAT is the first step to the international SKA telescope project, but it is already one of the best radio telescopes in the world and has placed South Africa firmly on the world map of radio astronomy and engineering.

Building a bridge
“This project enables us to build a bridge between secondary and tertiary institutions. Currently focused on senior secondary students, we aim to promote science through outreach events and activities. Using science and technology-based activities and events, such as stargazing at an observatory or exploring the universe in a planetarium, we want to attract these future secondary graduates. We also provide mentorship, hoping to help them improve their academic performance in matric,” said Mbonani.

For a whole morning, they spoke about their journeys, about science, about the skills that scientists acquire during their studies and all the opportunities such studies open up in an era where the 4th Industrial Revolution is predicted to reduce the number of jobs in many traditional professions. They addressed their peers in both English and Sesotho.

Astronomy in South Africa contributes to critical-skills development. Investing in the MeerKAT, for example, meant that over a thousand bursaries were made available through the SKA South Africa Human Capacity Development programme. Young scientists like Mofokeng and Mbonani have the opportunity to be part of MeerKAT science projects through their studies, using machine learning and other skills that are high in demand in today’s world. This was one of the messages they brought home.

Gaining new skills

“As an Astronomy research student, I have gained skills such as data analysis, mathematical modelling, communication and writing, programming, and teamwork, among others. These are requirements for most companies and institutions. With the unfolding of the 4th Industrial Revolution, such skills sets make young and aspiring scientists the perfect candidates for making the most of future opportunities,” reflected Mofokeng.

Most of the learners said they have never attended a science-outreach event. They were inspired by the young scientists’ stories and nearly half of them said they could see themselves pursuing a career in science. The learners also expressed a strong interest in more events of this kind, as well as mentorship during Grades 11 and 12 from peers at university. They asked about the salaries earned by astronomers, how long the studies take, and where astronomers are working in South Africa.

This initiative, started by two bright young scientists, hopefully marks the beginning of many more events of this kind. Mofokeng and Mbonani are already planning what to do on their next trip home.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept