Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
03 July 2020 | Story Prof Francis Petersen and Motsaathebe Serekoane
Motsaathebe Serekoane,left, and Prof Francis Petersen.

The South African statue debate is back in the spotlight again, as statues deemed controversial or offensive are coming down in America and Europe during demonstrations against racism and police violence that have renewed attention on the legacy of injustices. This follows the death of George Floyd, an unarmed black man who died after a Minneapolis police officer kneeled on his neck for more than eight minutes. 

The world has witnessed the toppling of Confederate statues in San Francisco, Washington, DC, and Raleigh, North Carolina in the US, as well as a statue of slave trader Edward Colston in Bristol and the statue of slave holder Robert Milligan, which was removed from outside the Museum of London Docklands in the UK.  The statue of Paul Kruger on Church Square in Pretoria was again vandalised with red paint during a #BlackLivesMatter protest, as was the statues of Voltaire, a leading thinker and writer in France, and Hubert Lyautey, a French general and colonial administrator.

The attacks/hostilities against statues started in 2015 when the statue of Cecil John Rhodes at the University of Cape Town was torn down by students during the height of the #RhodesMustFall protest, which subsequently led to the #FeesMustFall protest that saw the statue of CR Swart at the University of the Free State being toppled a year later. 

The challenge in the South African context
The traditional definition and meaning of spaces inhabited by people (including temporarily) still renders some of the public spaces unwelcoming and excluding by virtue of their names, presence of symbols, and inscriptions. These spatial markers have a historical significance link with certain social identities or representation, and there is an increasing call for the reconfiguration of public spaces. It is argued that the symbolic landscape also requires change if a city/metro is to incorporate all its citizens and their histories into the fabric of an ‘imagined’ inclusive and just city.

The politics of symbolic representation has been at the heart of decolonisation and post-apartheid transformation. At stake in South Africa – with the historical legacy of segregation policies – is the competing and often conflicting notion of space, and the ideological notion of commemoration or memorialisation, coupled with the lack of shared collective memory and meaning of public representation. 

This calls for a pro-active approach towards the preservation and conservation of heritage resources material. In line with the National Developmental Plan 2030 (NDP 2030) – as a transforming country (with the baggage of both colonial and apartheid legacies) – the state is striving to cultivate an environment that is inclusive and socially just. The transformation of spatial milieu presupposes collective ownership and management of space, founded on the permanent and temporary participation of the 'interested and affected parties' with their multiple, varied, and even contradictory political interests. In the review of the current symbolic landscape for inclusion, it is suggested that spatial identity transformation be negotiated; the process must develop from a nexus that understands the interrelationship between space and spatial inscription through the form of street names, symbols, public art, and other forms of spatial markers.

Important to note is that symbolic power is inherent in these processes of change and includes, among other things, erasure and recognition and competing notions of spatial inscription or re-inscription. Notwithstanding the progress made to date, the following remains a challenge: reflecting on the definition and meaning of spaces that have become public; critical reflection on the role of memorabilia in the post-embedded-conflict society; the notion of preservation and conservation in the post-embedded-conflict society; reflecting on the role of memorabilia for documentation and educational ends; and finally, broadening the heritage landscape.

The politics of recognition
Five years since the #RhodesMustFall and #FeesMustFall movements, different forms of memorabilia still remain at the centre of discontent. The observation is that contemplative conversations on these diverse commemorative markers, sites, and symbols established during the colonial, apartheid, and democracy eras are becoming a threat to the country’s NDP 2030, and in particular the social cohesion project. South Africa and the rest of the world continue to struggle to situate/re-appropriate historical text in the contemporary politics of recognition. The demand for recognition in the post-conflict society is given urgency/traction by the hypothetical links between recognition, identity, and public representation. Recent literature postulates that non-recognition or misrecognition in the metros or city spatial landscape can inflict harm, be a form of oppression, or imprison someone in a false, distorted, and reduced mode of being and belonging. Despite the Ministry of Arts and Culture’s investment in transforming the heritage landscape across South Africa – from the level of policy and legislation, the establishment of new commemorative markers, and heritage institutions – the question on what to do with symbols of South African histories and how to deal with them against the backdrop of preservation and conservation in the post-embedded conflict society, remains unclear.

Legislative framework
Whereas the NDP 2030 is advancing a social cohesion vision, section 37 of the South African Heritage Act, No 25 of 1999, protects public monuments and memorials from any form of altering, damaging, or relocation and prescribes a minimum requirement before any form of action is taken. Although the Act is advancing the protection of heritage resources, an interpretation of the Act is that it makes provision for the re-imagination, creative, and responsible review of heritage in a post-embedded conflict society, thus broadening the heritage landscape through reconfiguration discourse of re-interpretation, re-appropriation, relocation, and removal. It is a balancing act with embedded and enmeshed complexities. 

Emancipatory claim-making in the quest for spatial parity
The statue debates continue to be characterised by a polarised disposition. At the one end of the continuum are individuals who hold a strong view and advocate for the ‘cleaning’ of what is deemed painful reminders of past atrocities in the public, which is now accessible to all. On the other end of the continuum are individuals arguing for the juxtaposition model. The process of striving towards a space for equity (cf. socio-spatial justice) and inclusion – needless to say – requires the asking of some difficult questions. 

Towards the inclusion end, the argument is for spatial re-imagination that will have the courage to disrupt homogeneity and advance heterogeneity in pursuit of a spatial landscape where differences intersect, influence each other, and hybridise in pursuit of dialogic engagements and transformative output. 

The UFS and the MT Steyn statue – a transparent and consultative approach
True to the ideals of a contemporary university, which is an intellectual space that encourages new ideas, controversy, inquiry, and argument, and which challenges orthodox views, the UFS has approached the call to remove the MT Steyn statue from the Bloemfontein Campus of the university in a transparent and consultative manner, respecting the different views and perspectives. In fact, the UFS adopted an Integrated Transformation Plan (ITP) in late 2017, aiming at an institution ‘where its diverse people feel a sense of common purpose and where symbols and spaces, systems and daily practices all reflect commitment to inclusivity, openness and engagement’ – the ITP, which embodies social justice, was used as the framework for engagement on the MT Steyn statue.

The South African Constitution, which celebrates the diversity of our nation, upholds the rights of all people to freedom of speech, and specifically protects academic freedom. To shut down the right to speak or ask questions in the context of a public debate is unacceptable in a democratic society. Rude or violent behaviour rarely serves to change how people think about any particular issue – on the contrary, it polarises views and makes it harder to listen to one another. 
In this engagement process on the statue, it was important for members of the UFS community to exercise tolerance to listen, to engage with strongly divergent views, and to do so in a manner that is respectful, so that it expands the space for debate. This indeed happened through seminars, public lectures, panel discussions, radio and television interviews, and public opinion pieces. Through these engagements, four options were put forward in relation to the MT Steyn
statue:
• The statue remains as it is,
• The statue remains as it is, and the space around the statue is reconceptualised,
• The statue is relocated to another position on campus, and
• The statue is relocated off campus

Part of the engagement was a heritage impact assessment (HIA) with a public participation process. The public participation process (60 days) included the exhibition of a reflective triangular column erected in front of the statue, primarily to keep the statue topical, but it also edited the statue out of its power position if viewed from the east along the main axis from the city of Bloemfontein. Public notices and advertisements were placed in both local and national newspapers, while the family of President Steyn was kept informed of developments.

Although the call to remove the statue has challenged and re-energised a critical engagement around the purpose of a university in an unequal society – both as a site of complicity and as a potential agent for social change – the call should never be interpreted as an attack on President Steyn (the person), but rather what a 2 m tall statue represents for a changing student and staff demographic on the UFS campuses.

Honouring the legislative processes through the Free State Provincial Heritage Resources Authority, the UFS Council approved the relocation of the MT Steyn statue from the university campus to the War Museum in Bloemfontein – the ‘dignified’ dismantling of the MT Steyn statue took place on 27 June 2020. With the statue at the War Museum, Steyn’s contribution as an anti-colonialist and anti-imperialist will be fully understood by all South Africans in the context of the South African War, as portrayed by the museum.

Reimaging an inclusive public space faces many obstacles and challenges in engaging with existing spatial markers, differences, diversity, and cultural heterogeneity in creative and productive ways.  However, the path followed by the UFS to relocate the MT Steyn statue creates a unique opportunity for a discussion on how spatial re-interpretation can promote inclusivity and meaning of space in a sustainable manner that balances the intricacies of the past, the present, and the future. All considered, it is a difficult process; but change cannot just be for the sake of change, there should be an emancipatory claim in the quest for a just society, advancing reasoning over rage.

Opinion article by Motsaathebe Serekoane, Lecturer: Anthropology, and Prof Francis Petersen: Rector and Vice-Chancellor, University of the Free State
 

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept