Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
11 April 2025 | Story Martinette Brits | Photo Supplied
Italian Design Day Competition Winners
National student competition winners, UFS's Gustav Pretorius and Jeanré Erasmus, pictured with Matteo Cibic and Michele Gialdroni, Director of the Italian Cultural Institute.

Two talented Architecture students from the University of the Free State (UFS), Jeanré Erasmus and Gustav Pretorius, have achieved national acclaim by winning the prestigious Italian Design Day 2025 Competition held in Pretoria. Their innovative exhibition space, inspired by The Dancer -  a dynamic ceramic sculpture by renowned South African artist Andile Dyalvane – captivated the judging panel and emerged victorious from among 45 entries submitted by 140 students from across South Africa.

 

Passion meets purpose 

For Erasmus, now in his third year of Architecture and working part-time at Soleil Architects, the path to this milestone began at an early age. “Ever since I was little, I’ve been obsessed with building things,” he recalls. His fascination with design and problem-solving naturally evolved into a passion for architecture, and he credits the UFS for providing a nurturing environment where both his technical skills and creative thinking could flourish. 

He credits his lecturers and peers for constantly challenging his ideas and pushing him towards excellence. He highlights the impact of former lecturer Martie Bitzer in shaping his journey. “We have an amazing, talented, and kind lecturer in Martie Bitzer, who has a big heart for architecture and her students,” he says. 

Pretorius, a fourth-year student, shares a similar drive. His design philosophy is deeply rooted in human experience and storytelling – an approach that played a key role in their winning design. “For me, architecture is not only about the physical form –  it is about how people interact with and move through space,” he explains. He believes their studies at UFS prepared them well to take on real-world challenges, equipping them with both conceptual depth and technical precision. 

 

Designing the story 

The Italian Design Day 2025 Competition, held on 24 February 2025 in Pretoria, tasked students with designing an exhibition space that captured the whimsical and narrative-rich aesthetic of renowned Italian designer Matteo Cibic. Instead of simply showcasing objects, the brief called for storytelling through design. 

Erasmus and Pretorius rose to the challenge by creating a space that echoed the movement and transformation embodied in Dyalvane’s The Dancer. “We didn’t want to use the static display cases,” explained Erasmus. “We designed the space that guided visitors through an interactive journey, rooted in the idea of shaping and refining - mirroring the movement and storytelling embedded in Dyalvane’s clay sculpture.”

Their concept impressed a panel of esteemed judges that included architects, Fanele Zondi and Braam de Villiers, and Stefania Iuliano, Commercial Attaché at the Italian Embassy in Pretoria. The panel’s combined expertise ensured a thorough evaluation of creativity, innovation, and spatial storytelling.

 

Overcoming creative challenges 

Developing a design that balanced imaginative expression with practical execution was no easy task.  “Picture two architecture students staring at a blank page late at night, questioning their life choices,” Erasmus jokes. One of the greatest challenges was translating a deeply emotional concept into a physical space - but through teamwork and continuous refinement, they achieved a balance between form and function.

“Like any great duo – Batman and Robin, peanut butter and jelly, architecture and last-minute deadlines – we balanced each other out,” Erasmus adds. Pretorius agrees, noting that their shared technical mindset kept the design process grounded in feasibility while still allowing room for creativity. Their ability to combine conceptual innovation with structural logic ultimately set their entry apart.

 

A milestone moment

When Erasmus received the call announcing their win, the moment was surreal. “It was a mix of shock and excitement, with a little bit of ‘Wait, is this a prank?’” he says. Although initially sworn to secrecy, the pair struggled to contain their excitement. “We didn’t exactly stick to that rule,” Erasmus admits with a laugh. 

Beyond the accolade, this experience has been transformative. “This experience has been like a masterclass in storytelling through space,” says Pretorius. “It reminded us that architecture is not just about buildings – it is about making people feel something.”

Looking ahead, both students are eager to continue exploring the narrative potential of architecture. Erasmus is particularly interested in how design intersects with various forms of artistic expression, while Pretorius plans to focus on sustainable and experiential design. They agree that the competition has reinforced their belief in architecture as a powerful tool for storytelling and human connection.

 

The winning exhibition space:

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept