Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 December 2018 | Story Andre Grobler | Photo Supplied
Drought read more
Water-saving initiatives have been implemented throughout the university’s campuses to withstand the drought.

An attentive visitor to the University of the Free State (UFS) would have noticed that in the past year, certain parts of the Bloemfontein Campus’ gardens have undergone a change. This is part of the UFS’s water-wise and grey-water initiatives that are a response to the ongoing local drought conditions and water restrictions.

Waterless gardens

Senior Director: University Estates, Nico Janse van Rensburg, says the environmental conditions have had a severe impact on the appearance of the gardens. “The era where we had big lawns, has passed.”

Janse van Rensburg says the UFS decided to start the initiative at two highly visible areas, two traffic circles, one at the George du Toit Building and the other the Francois Retief Building.

More landscape changes can be seen in the gardens around the Biotechnology Building, Geography building and Muller Potgieter Building, as well as near the Institute for Groundwater Studies, Engineering Science and the Thakaneng Bridge.

Towards an energy-efficient environment

Paving in these areas is designed to allow for water to soak into the ground. Acting Grounds Services Manager, De Wet Dimo, says more than 100 indigenous trees, which are more adaptive to local environmental conditions, have also been planted. He says a new wood chipper which was recently purchased, will turn dead trees in gardens into wood chips to be used as mulch for new plants.

Dimo says the new look and feel of the gardens was created by using hard elements, paving and indigenous succulents.

New student residences, including those in Qwaqwa and South Campus will use a grey-water system using water which will be collected from showers and basins. The piping at two older residences on the Bloemfontein Campus has also been renovated to a two-way system.

“Rainwater harvesting systems have been fitted at all residences and academic buildings,” said Dimo. The 19 tanks that have been installed have a storage capacity of 265 kilolitres.  Janse van Rensburg says other water-wise initiatives that have been put into action include installing waterless urinals in administrative and academic buildings, water restrainers, pressure control systems (reducing the volume of water) and push-button systems instead of taps.

News Archive

Fresh new look for UFS Sasol Library
2013-02-28

The revamped entrance area of the UFS Sasol Library.
14 March 2013
Photo: Johan Roux
The UFS Sasol Library on the Bloemfontein Campus has been given a new lease on life with a fresh new look to cater for the changing study needs of students. Over the last few months several upgrades have been made to ensure that students get an effective learning experience.

These upgrades will be spread over three phases. Upgrades include newly-built overnight study facilities, partitioned study areas for postgraduate students and areas for leisure reading. Special attention has also been given to security, with the access control system and the tattle-tape security system being moved to the foyer on Level 2. This level, which used to serve only as a thoroughfare to and from the eastern and western parts of the library, has been turned into proper foyers on either side.

"The UFS Library and Information Services are on a mission to present itself as the physical and virtual information hub of choice," says Director Betsy Eister.  "The increased intake of new students and technological developments has sparked the notion of new and revamped study spaces conducive to learning.”

Eister says that, after completion of all three phases, the library will have increased study spaces that appeal to different people with different needs – spaces for studying, leisure reading, newspaper reading, accessing wired and wireless connections and spaces for discussions.

The project which started in October 2012 is part of the university's space planning projects to optimally utilise space on the Bloemfontein Campus. The project will also see the Centre for Teaching and Learning move to level three of the library.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept