Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
12 February 2018


The University of the Free State (UFS) has an enrolment plan for 2007–2019 that was approved by the Department of Higher Education and Training (DHET). The university is compelled to adhere to these enrolment targets, as over-enrolment poses a risk to the academic integrity, financial sustainability, and student success of the university.
 
The UFS received 47 000 applications for admission in 2018, of which 17 000 applicants received final admission. All admission letters clearly stipulate that admission is subject to availability of space during registration. The enrolment target for new first-time entering students for 2018 is 8 000, therefore only 8 000 students can be registered across the university’s three campuses during this intake period.
 
The Executive Management of the UFS welcomes the fact that President Jacob Zuma’s announcement on 16 December 2017 about free education for the poor and working class has allowed many more students the opportunity to register. Several meetings between the Executive Management and the Student Representative Council (SRC) have taken place since the beginning of 2018 to discuss the implications of the President’s announcement. Engagement with the SRC regarding the registration process is also continuously taking place.
 
Online registration for all students opened on 8 January 2018. The UFS has put several measures in place to assist new first-time entering undergraduate students. Furthermore, students who have moved into residences and participated in the university’s Gateway Programme, as well as students who arrived on campus, were assisted to register for programmes with available space. In cases where the first option of study was full, students were redirected to other programmes with available space within the specific faculty or other faculties, provided that they comply with the relevant admission criteria. Only mainstream programmes in the Faculty of Economic and Management Sciences now have space left. The rest of the undergraduate programmes in all faculties on all the campuses are full.
 
Students who could not be accommodated in any of the programmes due to limited space are being directed to the Central Application Clearing House (CACH).

News Archive

UFS takes steps to address power shedding
2008-01-31

The problem of power shedding was urgently discussed by the Executive Committee of the Executive Management (Exco) during its meeting yesterday.

A report was presented by Ms Edma Pelzer, Director: Physical Resources and Special Projects, and a consulting electrical engineer about possible short, medium and long term solutions for the UFS.

This includes (a) the possible installation of equipment (eg. power generators) and (b) operating procedures to ensure the UFS’s functionality despite power shedding.

We are also in contact with Centlec to bring about the best possible arrangements for the UFS regarding the power shedding. It is possible that refined power shedding schedules will be implemented within a few weeks or a month to ensure that there is minimal disruptions at the UFS (especially during evening lectures).

In the long term it is unaffordable to generate power for the whole campus to meet everyone’s electricity needs. Only critical points will be supplied with emergency power generators.

Emergency power generation for certain critical points have already been provided for (eg. the Callie Human Centre, the evacuation of large halls, computer services, critical long term research projects, etc.). We have been doing surveys since 2006 to determine the UFS’s preparedness for “normal” power failures. The extent of the current situation has, however, taken the whole country by surprise.

Certain urgent steps were decided on yesterday. A decision was made to immediately design emergency power systems and supply it to the new examination centre and large lecture halls such as the Stabilis, Flippie Groenewoud, Agriculture building, and possibly the West Block. The delivery and installation of these systems will, however, take from three to six months.

The UFS will have to manage despite the power shedding, even after the emergency power systems have been installed and we will not be able to function as normal. Every division must devise operating procedures to deal with the power shedding without jeopardising the quality of core functions.

Bloemfontein is luckier than many other cities because Centlec is able (so far) to keep to the published schedule to a large extent.

Plans are also being made to keep staff and students continuously informed via the UFS web site about expected power shedding schedules and risks of power shedding in the course of a day.

Exco requests every faculty and support service to think about suitable operational solutions for managing their work and meetings during a power shedding.

Every line head has instructions to urgently determine the situation and needs in his or her division and indicate what practical arrangements can and must be made to schedule work around the power shedding. Every line head must provide Exco with a status report within a week.

In this way critical areas in terms of core functions and high quality service delivery will be determined and receive attention. Security systems and the safety of staff and students will also receive specific attention - this includes the residences.

In the mean time the Department of Physical Resources will carry on with a wide-ranging investigation into the extent of needs and plans and will compile a budget for the solution thereof.

Prof. Teuns Verschoor, Vice-Rector: Academic Operations, and the deans had a meeting yesterday to discuss problems and possible solutions around the power shedding in eg. computer rooms, during evening lectures, and practical classes.

Options may include eg. alternative time slots (eg. weekends) or alternative halls (eg. at the Vista Campus) for evening lectures which are affected by power shedding, or adjusted teaching methods.

Staff is requested not to install their own power generators under any circumstances. It can be very dangerous when such apparatus are linked to a building’s electrical system. The safety of staff and students and the risks of fire or injuries must also be the highest priority under all circumstances.

The Department of Physical Resources is also in the process of investigating options such as smaller power generators or ‘UPS’ apparatus as part of a broader evaluation of needs and potential solutions.

Exco wants to ensure all staff and students that this matter is receiving urgent attention and will keep on receiving it.

If there are any practical solutions about dealing with the power shedding (such as alternative ways of working) you are invited to send an e-mail to: lightsout@ufs.ac.za  

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept