Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
26 September 2018
The Cardiac Simulation lab in action

There’s an electric atmosphere in the operating theatre of the Faculty of Health Sciences, as Dr Taha Gwila and his team focus with intense concentration on the fleshy exposed heart beating rhythmically in the opened chest of the patient lying in front of them. The enormous demands of open-heart surgery are evident to everyone looking on. But there’s a catch. 

The patient is faceless and rubberised. The red liquid flowing in the pipes that network from the body is not blood. And the pulsating heart was beating in the body of a pig not too long ago. 

Cutting edge technology
 
This Cardiac Simulation laboratory supplied by Medtronic is the newest addition to the School of Biomedical Sciences’ clinical simulation and skills unit. 

“There’s nothing like this in Africa, and only a few in the world,” says a beaming Prof Francis Smit, Head of Cardiothoracic Surgery at the Faculty of Health Sciences.
He explains that this new cutting edge medical technology will revolutionise the way cardiac surgeons and other health professionals are trained and assessed.

Practicing specific procedures

The simulation facilities give students with various levels of competency the opportunity to practice specific procedures in their own time and at their own pace.
“Traditionally training followed the apprentice model, where surgeons started with simple tasks and worked their way up. They assisted senior personnel and their exposure to procedures depended on the conditions presented by the patients before them,” explains Prof Smit.

The simulation technology now enables them to repeatedly practise a certain procedure without any risk to a patient. A sophisticated electronic grading system gives detailed feedback after each session, so they know in which areas to improve.  

Simulated emergencies

The system also allows trainers to create a medical emergency that the trainees then have to deal with.

“Assisting senior surgeons with high levels of competency means that in the past, trainees would often never get the chance to experience these kinds of complications during operating procedures. Now we give them a chance to build that confidence so they’ll be able to handle different situations.”  

Training hub for Africa
 

The UFS cardiothoracic programme is being designed to become a training hub for the whole of Southern Africa, combining distance learning with an on-site high-fidelity simulation and assessment centre.

“This is 100% real!” says an excited Dr Gwila after successfully completing his first simulation session. “As a Senior Registrar at the Cardiothoracic Department I’ve done similar procedures on real patients and there’s really no difference at all. Every registrar should do this before ever touching a real body.”

News Archive

UFS busy with building projects to the value of R220 million
2010-07-26

Pictured at the sod-turning ceremony are, from the left: Mr Nico Janse van Rensburg (Manager: Physical Planning), Prof. Jonathan Jansen (Rector and Vice-Chancellor of the UFS) and Prof. Dennis Francis (Dean: Faculty of Education).
Photo: Ula van Zyl


Since 2009, the University of the Free State (UFS) has already rolled out building projects to the value of R220 million on its Main and Qwaqwa Campuses. 

Some of these projects include a new building for Education Training for the Faculty of Education, which will be erected at a cost of R21 million on the Main Campus opposite the UFS-Sasol Library. The sod-turning ceremony of the centre took place last week.

Prof. Jonathan Jansen, Rector and Vice-Chancellor of the UFS, turned the first sod and a tree was also planted at the future entrance of this impressive building. “I am impressed with the eco-friendly design of the building and what the project promises for the future of the faculty and the UFS. It is important that the UFS continues to expand and improve,” he said.

The building, which will primarily be used for the training of Mathematics and Science teachers in the foundational phase, will amongst others boast three classrooms with seating for 100 students each, an auditorium that can seat 225 students and an office block. The auditorium will also be used as a classroom in the traditional African context of open-air teaching. The building has been designed to save water and power efficiently and will be completed by the end of 2011.

Other building projects that have been rolled out on the Main Campus this year include a building consisting of lecturing halls as well as offices for the Faculty of Health Sciences, a new skills laboratory, new laboratories, etc., at the Biotechnology Building, the renovation of the Stef Coetzee Building, die upgrading of various lecturing halls, the upgrading of service workers’ quarters, as well as the installation of computer rooms in virtually all the hostels.

Various other projects are in the pipeline, for example, extensions to the building in which the Department of Architecture is housed. At the Qwaqwa Campus, a new building for the Faculty of Education is under construction, laboratories are being renovated and new hostels for 200 students are being built. 

Media Release:
Lacea Loader
Director: Strategic Communication (actg)
Tel: 051 401 2584
Cell: 083 645 2454
E-mail: loaderl@ufs.ac.za 
26 July 2010



 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept