Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
05 February 2019 | Story Xolisa Mnukwa | Photo Moeketsi Mokgotsi
KovsieAct Eco Cars Read More
Kovsies weld their way to a sustainable environment

The 2019 group of first-year students can look forward to a fun and adventure-filled first two weeks (28 January–9 February) of varsity life, as a number of projects and activities await them.

Kovsie ACT’s main theme for 2019 revolves around building ‘awareness’. This includes a tree-and-traffic-signs project which entails old T-shirts/material being sewn/crocheted together to make different patterns to be fitted around the trees on campus in order to create a beautiful piece of art portraying a message of ‘awareness’.

A canvas painting will also form part of the events, as first-years – with the help of their seniors – will be required to put together a painting that addresses environmental, crime, gender-based, and other societal issues that will later be placed on the wall at the Thakaneng Bridge.

On the morning of 9 February 2019, seniors will tackle the community-engagement leg of the Kovsie ACT line-up, working in their respective teams to decorate an eco-vehicle from waste materials. Each team has their own Pit stop – decorated in F1 style. This eco-vehicle race will take place on Saturday morning from 09:00 – 12:00 in Academia road (in front of Emily Hobhouse Residence).  In addition, art sculptures will be built to form part of the Eco-vehicle race. These art pieces - if approved – will after the Eco-vehicle challenge be assigned a spot on campus where it can spread the message of awareness and be appreciated by fellow students.

The abovementioned projects are expected to withstand adverse weather conditions and last for a minimum of six months.

To close off the Kovsie ACT activities, students and the public can see forward to exciting performances during the Kovsie ACT music festival on the evening of 9 February. This will include musical sensations such as the likes of Sho Madjozi, Bittereinder, Busiswa, and many more.

Tickets for the festival are available at the UFS Bloemfontein Campus Rag Farm and the Food Zone store. For more information on Kovsie ACT, visit https://www.ufs.ac.za/rag or contact Esmé Wessels at WesselsE@ufs.ac.za

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept