Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
25 February 2019 | Story Ruan Bruwer
Tharina van der Walt
The hammer thrower Tharina van der Walt is one of several first-class athletes among the first-year students at Kovsies this year. She is the South African U18 champ and record-holder in 2018.

Several top athletes, some of whom were the very best in the country in their respective events at school, have joined Kovsies as first-year students. They already had their first taste of glory as Kovsies when they recently won their events at the first-year meeting.
 
Among these first-years are Jannes Schlebusch (javelin thrower), Joviale Mbisha (sprinter), Colette Uys (discus/shot-put), and Tharina van der Walt (hammer thrower), who have all represented South Africa in the past two years.
 
Schlebusch won the silver medal at the World U18 championships in 2017, but was injured last year. Great things were expected for 2019, but during the first-year meeting he injured his ankle to such an extent that he will have to undergo an operation that would put him on the sideline for the rest of the season.
 
Van der Walt was the South African schools champ in the hammer throw for girls U19 in 2018, when she managed to set up a new school record of 57,83 m. She was ranked fourth at the World U18 champs in 2017. At the same meeting, Mbisha ended 14th in the 100 m.
 
Uys, who participated in the CAA Southern Region Youth and Junior Championships last year, achieved a second place in the discus at the 2018 National Secondary Schools Championships for girls U19. Other first-years who took part in the SA’s last year, are Vicky Oelofse (1 500 m) and Michael Skosana (long jump).
 
They will strengthen Kovsie Athletics, which already boasts a large group of athletes with international experience. Of the 16 athletes who participated internationally last year, only Kesa Molotsane and Lara Orrock will not be in action for the students again.
 
■ Imperium Residence won the men’s division and Arista/Amelia were the ladies’ winners.
 

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept