Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
14 January 2019 | Story Thabo Kessah | Photo Thabo Kessah
Dr Lisa Komoreng
Dr Lisa Komoreng’s research highlights traditional medicinal plant qualities used to deal with diseases like TB and elephantiasis.

The burden that diseases like tuberculosis (TB), lymphatic filariasis (elephantiasis), sexually transmitted infections (STIs), skin infections, and ear, nose and throat (ENT) infections bring to the country, mainly poverty-stricken communities, has prompted Dr Lisa Komoreng to focus her research on traditional medicinal plants.

 

South Africa, says Dr Komoreng, has the third highest number of reported cases and the fifth highest number of estimated prevalent cases, with the second highest burden of drug-resistant TB cases in the world amongst the 22 high-burden countries.

South Africa is burdened
by elephantiasis and treating
it remains a huge problem,
says Dr Lisa Komoreng.

 

“According to the Free State Provincial Strategic Plan (2012-2016), HIV and TB are the leading causes of death in the Province, with TB being the second most leading cause. Our country is also burdened by elephantiasis and treating it remains a huge problem. Patients are often turned away from some of the public hospitals, reasons being that there is no treatment in the country or that the disease needs specialist care. It with this in mind that my research focuses on providing treatment that is cheaper than western medicine, easily accessible, with fewer or no side effects,” she said.

 

“People suffering from elephantiasis are not only physically disabled, but they suffer mental, social and financial losses contributing to stigma and poverty. Some of the drugs used to treat the disease are ineffective against adult parasitic worms, which are the ones that cause the disease, and they also have side effects. Our research in dealing with these diseases enables us to work hand-in-hand with herbalists, traditional healers and people who have indigenous knowledge about the use of traditional medicine. We consult with them in order to acquire information about the medicinal plants that are used to treat and manage those diseases. Once they provide us with information, we collect the plant species together, which we subsequently take to the University herbarium for proper identification of their scientific names and to the laboratory for experiments,” she added.

 

Dr Komoreng is a Senior Lecturer in the Department of Plant Sciences at the Qwaqwa Campus. She has authored and co-authored over 15 research articles and has presented her research at various national and international conferences.  Her research team comprises of 5 MSc and 4 PhD students.

 

The Thuthuka NRF Rating Track (2015 – 2017 and 2018 – 2020) funds the research project on elephantiasis.

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept