Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
08 December 2020 | Story Leonie Bolleurs | Photo Supplied
At the BJCP beer judging competition, Dr Errol Cason won Best of Show with his Belgian Saison. Here he is presenting at the AfricaBrew2020 Brewing conference.

Staff and students from the University of the Free State (UFS) once again proved their skills in beer homebrewing when they walked away with one first place and two second places at the 13th annual Anheuser-Busch Inbev (AB-Inbev) – formally South African Breweries (SAB) – intervarsity beer brewing and tasting competition, and the Beer Judging Certification Programme (BJCP) competition held at the AfricaBrew2020 Brewing conference. Both these events took place over the weekend of 27 and 28 November 2020.

Evil Twin Double and Three Sips German 

Competing in the AB-Inbev/SAB Intervarsity brewing and tasting competition, was a group of students from the UFS Department of Microbial, Biochemical and Food Biotechnology, consisting of Eduvan Bischoff (PhD student), Elzette van der Walt (MSc student), Culien van der Merwe (MSc student), Gunther Staats (MSc student), and Twyne Skein (MSc student). This team came second in both the Indian Pale Ale (IPA) category with their Evil Twin Double IPA and in the Lager category with their Three Sips German Pils. 

“This is an outstanding accomplishment. Congratulations also go to our fellow Free Stater’s at the Central University of Technology (CUT) for winning the India Pale Ale (IPA) category as well as best overall beer with their New England IPA,” commented Dr Errol Cason, Senior Lecturer in the UFS Department of Animal Science, also representing the liquid yeast company LiquidCulture Yeast.

According to Dr Cason, this SAB-sponsored competition sees students from local universities brew and enter beers for judging, and competing for prizes, including the coveted ‘Best of Show’ trophy. 

“This event also aims to promote beer culture along with responsible drinking, by hosting talks by industry experts where students can interact with commercial brewers, scientists, and marketers,” says Dr Cason. 

The event was hosted by South African Breweries (SAB) and CUT, through the Centre for Applied Food Sustainability and Biotechnology (CAFSaB), in association with the UFS. 

Although the event was moved online in 2020 due to the international pandemic, it did not mean that there was a decline in the quality of presentations, or in the beer entered by universities. – D r Errol Cason

Dr Cason explains that entrants are usually challenged to brew beers according to the 2015 Beer Judge Certification Programme (BJCP) guidelines in lager, IPA, winter warmer, and fruit beer categories. 

“This year included the African Premium Ale and Lockdown Brew categories as well, where teams were mostly left to invent and experiment on their own with a few rules, such as using only indigenous African ingredients or ingredients that were available in supermarkets during lockdown,” says Dr Cason. 

There is also an award for the best bottle dress (label). 

Dr Cason believes that although the event was moved online in 2020 due to the international pandemic, it did not mean that there was a decline in the quality of presentations, or in the beer entered by universities. 

Belgian Saison and Extra Special Bitter

He and Christopher Rothmann, who is busy with a PhD in Biotechnology at the UFS and is co-founder of the company LiquidCulture (LC) Yeast, attended and presented at the AfricaBrew2020 Brewing conference. AfricaBrew is an annual brewing conference specialising in workshops and demonstrations for home and professional brewers. 

Accompanying the conference is a BJCP beer judging competition where all home and professional brewers can enter beers. During this competition, Dr Cason won Best of Show with his Belgian Saison. Rothmann came second with his Extra Special Bitter.

Since LiquidCulture Yeast was found in 2018, this commercial venture has since spun out and are now providing liquid brewing yeast to the homebrewing and commercial brewing industry. Rothmann and Dr Cason are also founding members of the Kovsie Brewery (along with Dr Jan-G Vermeulen and Eduan Hellmuth), which is currently being constructed on the UFS Paradys Experimental Farm facility.

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept