Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
30 September 2020 | Story Nitha Ramnath | Photo Supplied
SWSA represented by Mariné du Toit (left) and Lyshea Mapaike(right) at the handover of the funds raised

Sunflower Children’s Hospice, situated on the ground floor of the National District Hospital, is a non-profit organisation that provides care and compassion for all children with life-threatening and life-limiting conditions. As far as possible, the hospice aims to keep children within their families and communities, with relevant supervision and support.  However, the hospice is also a permanent residence to many children.

At Sunflower Children’s Hospice, children and their families are provided with:
• palliative care, including pain and symptom management;
• quality of life;
• relief of suffering;
• support for child and family/guardians;
• developmental stimulation;
• support during the bereavement period;
• dignity in death;
• community participation; and
• relevant training.

Due to limited funds, the hospice experiences many financial challenges, which motivated the Social Work Student Association (SWSA) to become involved. Their involvement led to the establishment of the ‘#Adoptaflower’ project by raising funds for the organisation and getting more Social Work students to spend time with the children, as they do not have enough caregivers at the house to give them the special personal attention that they need.  This project was spearheaded by Mariné du Toit, Portfolio Head: Community Upliftment of the SWSA. 

The fundraising initiative collected R1 300 from selling raffle tickets to the university community.  Due to COVID-19 and the lockdown period, it became impossible to proceed with the intention of the Social Work students to spend more time with the children.  

Besides Social Work students not being able to proceed with their intention of interacting more closely with the children concerned, the lockdown unfortunately also affected it negatively in other areas.  The hospice needs assistance with clothes, toiletries, and groceries. Sunflower House therefore needs funds and sponsors to continue providing services to so many children in need of care and support. For more information regarding public involvement, 051 448 3813 is the number to call. 

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept