Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
11 February 2021 Photo UFS photo archive
The National Control Laboratory for Biological Products (NCL) Building.

There can be no compromise when it comes to the quality of medicines made available to the public.

The UFS-based National Control Laboratory for Biological Products (NCL) is a full member of the international WHO-National Control Laboratory Network for Biologicals and one of 12 laboratories worldwide contracted to perform vaccine testing for the World Health Organisation (WHO). The NCL is also the only vaccine-testing laboratory in the country that performs the final quality-control testing of all human vaccine batches marketed in South Africa on behalf of the South African Health Products Regulatory Authority (SAHPRA).

In its role as a vaccine-testing laboratory for the WHO, the NCL helps to ensure that the vaccines purchased through the WHO prequalification programme for international distribution to resource-limited countries, meet the high standards of quality, safety, and efficiency. 

International testing standards

The laboratory received the status of a pharmaceutical testing laboratory after the South African Accreditation System (SANAS) endorsed its quality-management systems as of a high standard according to the International Standards Organisation’s requirements.

With its international testing standards, the NCL must ensure that all its operations – from the way documents are compiled and stored, to the maintenance of equipment and infrastructure, as well as staff competency – are performed according to international guidelines.

The laboratory has all the quality systems in place to ensure high-quality test results. The certificate of Good Manufacturing Compliance received in 2019 indicates that laboratory testing is on the expected level for any pharmaceutical testing laboratory and manufacturer. This certification is very strict and means that the NCL complies with exceptionally strict standards for pharmaceutical labs anywhere in the world. The certification offers the South African Health Products Regulatory Authority, the WHO, and other national control laboratories around the world the confidence that the test results from the NCL can be trusted.

Licensed as pharmaceutical manufacturer

The laboratory is also licensed as a pharmaceutical manufacturer. Although the lab does not manufacture, it needs to comply with manufacturing standards. It is rare for a pharmaceutical testing laboratory (such as the NCL) outside of a manufacturing context to qualify for both certifications.

News Archive

R40 million construction contract with black empowerment group starts at UFS
2006-09-04

During the ceremonial kick-off of the biggest construction project in the history of the UFS were from the left: Ms Vuyiwe Mkhupha (Manager of   Sikeyi Construction), Prof Frederick Fourie (Rector and Vice-Chancellor of the UFS) and Prof Steve Basson (Head of the UFS Department of Chemistry). Photo: (Gerhard Louw)

R40 million construction contract with black empowerment group starts at UFS   

The biggest construction contract in the history of the University of the Free State (UFS) to the value of R40 million has started on the Main Campus in Bloemfontein.  The contractors are Ströhfeldt Construction, in a joint venture with Sikeyi Construction, a black empowerment partner.

The contract comprises the extensive modernising, refurnishing and extension of the Chemistry Building.  This is the highest amount the UFS has ever spent on the refurnishing of a building. 
 
A number of initiatives have contributed to the fact that the UFS Department of Chemistry is one of the foremost chemistry departments in the country:
 

  • Expensive equipment and apparatus to the value of almost R20 million were acquired by the department the past year;
  • The basis of this is a strategic partnership with Sasol, the biggest research and development company  in the country;
  • The purchase of the most advanced 600MHz nuclear magnetic resonance spectro meter in Africa;
  • The purchase of a single crystal X-ray diffractometer; and
  • The purchase of a differential scanning calorie meter, used to test the effect of heat on chemicals.  This apparatus comprises of the most advanced detectors in the world.

“Natural scientists need the necessary equipment, apparatus and laboratories to be able to exercise world-class science.  Three years ago the UFS top management made a strategic decision to focus strongly on research and on our  laboratories and lecture halls,“ said Prof Frederick Fourie, Rector and Vice-Chancellor of the UFS, during the launch of the Chemistry Building’s refurbishment.

“I regard this project as a symbol of our investment in science and the academy,“ said Prof Fourie.

Prof Fourie said that the UFS spent almost R100 million in the last 5 years to renovate the Main Campus.  New buildings such as Thakaneng Bridge were built and other such as the Reitz Dining Hall was renovated and converted into the Centenary Complex.  “These projects, together with the refurbishment of the Chemistry Building, also show how the UFS contributes to the development and growth of not only Bloemfontein, but also how we invest in the Free State,“ said Prof Fourie.

According to Ms Edma Pelzer, Director: Physical Planning and Special Projects at the UFS, the current building originally comprised of the Moerdyk Building built in 1949 and a newer wing built in 1966.  This building became too small and obsolete and a new part is now being added to the eastern side.
  
According to Ms Pelzer a great deal of the project comprises the dramatic upgrading and modernising of laboratories, existing mechanical systems and the installation of new systems.  “The nature of the work of staff and students demands sophisticated mechanical systems such as air conditioning, fume hoods, the provision of gas, etc and therefore these received specific attention.  The research laboratories, lecture laboratories and office areas will also be separated for safety and greater efficiency,” said Ms Pelzer.

“Interesting design solutions for the complex needs of the department were found and I foresee that the building and its immediate environment will be an adornment to the Main Campus after its expected completion in 2008,” said Ms Pelzer.

Media release
Issued by: Lacea Loader
Media Representative
Tel:  (051) 401-2584
Cell:  083 645 2454
E-mail:  loaderl.stg@mail.uovs.ac.za
14 September 2006

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept