Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
11 April 2018 Photo Leonie Bolleurs
First accredited ICS training in SA presented at UFS
Prof Andries Jordaan, Head of DiMTEC, with Greg Archer from the United States Forest Services, and Yong Sebastian Nyam, a DiMTEC PhD student from Cameroon.

The University of the Free State’s (UFS) Disaster Management Training and Education Centre for Africa (DiMTEC) and the Free State Umbrella Fire Protection Association (FSUFPA) presented the first training exercise in the Free State, offering practical experience regarding the implementation of the Incident Command System (ICS) under simulated emergency conditions.

An Exercise Coordination Team (ECT), consisting of US instructors, under the leadership of Mike Kopitzke from the United States Forest Services, together with Johann Breytenbach from FSUFPA and supported by local personnel, facilitated the exercise.

Training complete with sand table exercise 

This dual site desktop exercise took place at the Rooipoort Training Centre outside Dewetsdorp and the DiMTEC offices in the Agriculture Building on the UFS Bloemfontein Campus. The Incident Management Team (IMT) training – complete with a sand table exercise   was presented at Rooipoort, At the same time a simulation of an Emergency Operations Centre (EOC) was offered at the DiMTEC offices. 

According to Prof Andries Jordaan, Head of DiMTEC, the exercise was based on a variety of actual scenarios that had previously taken place elsewhere in the Free State. The exercise simulated a train and bus accident on the Thaba Nchu road. “Using an incident like this keeps the training realistic and relevant,” he said.

In these exercises the work of different departments, including South African Police Services (SAPS), South African National Defence Force (SANDF), Transnet, Spoornet, Traffic Department, and Eskom are coordinated. “We would like to work with the National Disaster Management Centre (NDMC) to implement a uniform Incident management system in South Africa where all departments speak the same language and have the same understanding of the role and responsibilities of a command structure,” Prof Jordaan said.

Accredited training the outcome
In 2017 Prof Jordaan, General Elias Mahlabane from the SAPS, and Johan Breytenbach from the FSUFPA, attended an incident command course in California in the US. They were introduced to the National Incident Management System (NIMS) in the US. The system was implemented after lessons learned during 9/11. “According to the NIMS structure, all government organisations at all levels, as well as emergency agencies, had to standardise terminology and systems,” said Prof Jordaan.

Insight gained during the visit and a work relationship with the United State Forest Services, provided Prof Jordaan and Breytenbach the necessary background to conduct training for incident management teams.

Currently DiMTEC is offering accredited ICS 100, 200 and 300 courses. To qualify as incident command managers, students need to attend the ICS courses together with the practical training. As part of the training they also need to shadow a qualified ICS manager during two real incidents. These courses are taking place in conjunction with the FSUFPA. 

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept