Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
30 August 2018 Photo Xolisa Mnukwa
Haemophilia workshop the first of its kind at UFS
The UFS Department of Haematology and Cell Biology is producing quality medical graduates, addressing the high demand for trained graduates. Dr Anneke van Marle, Haematologist in the department, presented a lecture to final-year medical students on muscle and soft-tissue bleeding in haemophilia.

The Medical and Scientific Advisory Council (MASAC) of the South African Haemophilia Foundation (SAHF) has identified a need for more in-depth training of junior doctors on the basic aspects of the bleeding disorder haemophilia. 

Addressing this need in the sector, the Department of Haematology and Cell Biology at the University of the Free State (UFS) recently hosted a training workshop specifically targeting final-year medical students before they enter practice.

The Novo Nordisk Haemophilia Foundation is sponsoring this countrywide haemophilia training.

According to Jaco Joubert, Senior Lecturer and Pathologist in the Department of Haematology and Cell Biology, the department is very active in the field of haemophilia treatment, research and training, with representation on the Executive Committee of the Medical and Scientific Advisory Council of the South African Haemophilia Foundation.

Function with confidence

“The UFS Department of Haematology and Cell Biology has taken a proactive approach, by being the first department in South Africa to offer this training course to final-year medical students at the UFS; an investment in the future. The department runs the Bloemfontein Haemophilia Treatment Centre – which is the main haemophilia treatment and referral centre for patients from the Free State and Northern Cape. It is therefore ideally positioned to offer such training to students,” said Joubert.

Proactive role

The training workshop empowered and equipped students with more extensive knowledge on the practical aspects of managing patients with haemophilia; the various treatment products currently available in South Africa and laboratory diagnostic approaches in complicated cases. “This will enable students to function with more confidence during their internship and community service years,” said Joubert. 

He believes a training workshop of this calibre showcases the proactive role the department and the university is taking in the advancement of haemophilia training in South Africa.

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept