Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 December 2018 | Story Andre Grobler | Photo Supplied
Drought read more
Water-saving initiatives have been implemented throughout the university’s campuses to withstand the drought.

An attentive visitor to the University of the Free State (UFS) would have noticed that in the past year, certain parts of the Bloemfontein Campus’ gardens have undergone a change. This is part of the UFS’s water-wise and grey-water initiatives that are a response to the ongoing local drought conditions and water restrictions.

Waterless gardens

Senior Director: University Estates, Nico Janse van Rensburg, says the environmental conditions have had a severe impact on the appearance of the gardens. “The era where we had big lawns, has passed.”

Janse van Rensburg says the UFS decided to start the initiative at two highly visible areas, two traffic circles, one at the George du Toit Building and the other the Francois Retief Building.

More landscape changes can be seen in the gardens around the Biotechnology Building, Geography building and Muller Potgieter Building, as well as near the Institute for Groundwater Studies, Engineering Science and the Thakaneng Bridge.

Towards an energy-efficient environment

Paving in these areas is designed to allow for water to soak into the ground. Acting Grounds Services Manager, De Wet Dimo, says more than 100 indigenous trees, which are more adaptive to local environmental conditions, have also been planted. He says a new wood chipper which was recently purchased, will turn dead trees in gardens into wood chips to be used as mulch for new plants.

Dimo says the new look and feel of the gardens was created by using hard elements, paving and indigenous succulents.

New student residences, including those in Qwaqwa and South Campus will use a grey-water system using water which will be collected from showers and basins. The piping at two older residences on the Bloemfontein Campus has also been renovated to a two-way system.

“Rainwater harvesting systems have been fitted at all residences and academic buildings,” said Dimo. The 19 tanks that have been installed have a storage capacity of 265 kilolitres.  Janse van Rensburg says other water-wise initiatives that have been put into action include installing waterless urinals in administrative and academic buildings, water restrainers, pressure control systems (reducing the volume of water) and push-button systems instead of taps.

News Archive

Protest actions on the Main Campus
2008-03-12

Staff and students are kindly requested to take note of the following protest actions that will take place on the Main Campus.

As a result of a dispute over the status of roads on campus, permission was granted by the municipality and the court, in the presence of the university lawyer for the three actions. Strict conditions have been set for these protest actions.

a.) On Wednesday, 12 March 2008, Satawu and Nehawu will picket in front of the Main Building from 09:00 to 12:00. Three hundred persons will possibly attend this event. Marchers are not allowed within 10 meters from the Main Building and there will be 45 marshals present. This is not a march and no memorandum will be handed over. There may be no speeches.

b.) On Thursday, 13 March Nehawu will again picket in front of the Main Building from 13:00 to 14:00. This event must be peaceful. Only 125 Nehawu members may participate and protesters may not break away from the big group. They may not come within 10 meters of the Main Building. Twenty five of the protesters will be marshals. This is not a march and no memorandum will be handed over. No speeches may be made.

c.) On Friday, 14 March a march of Cosatu and Nehawu will take place. This march will probably be joined by a big number of people.

The march will continue through the Nelson Mandela Gate and will enter the campus grounds, but will be limited to the incoming lane of Chancellors Avenue from the Main Gate to the crossing with Alumni Avenue (in front of the Odeion). Speeches will be made and a memorandum will be handed over.

The march will reach the campus at 10:00 and from then the Nelson Mandela Gate will be closed for all traffic. The march must be finished by 14:00. The marchers will return to the city centre and could cause a traffic problem in Nelson Mandela Avenue.

The South African Police Service and the UFS’s Protection Service will monitor all these actions. Staff are kindly requested to use alternative gates to the Nelson Mandela entrance on Friday. Academic activities continue as normal.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept