Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 December 2018 | Story Valentino Ndaba | Photo Supplied
Sport ablution South Cam
Sports ablution facilities at the South Campus will ensure universal access.

As part of its 2018 infrastructure expansion, the University of the Free State (UFS) launched three solar farms earlier this year. The solar farm in Bloemfontein is large enough to power up to 300 houses, while the Qwaqwa and South campuses had 750kWp ground-mounted solar systems installed. 

“The power generated from the solar systems will always take preference over the conventional Centlec power supply meaning less power will be used from the national grid,” said Maureen Khati, Assistant Director at Facilities Planning.

All these sites will be connected directly to the university’s medium voltage electrical grid, thus the power can be distributed to areas where needed. 

The year that was 

The solar farms formed part of 274 new developments which were planned for the year by the Department of University Estates. These covered all three campuses and the off-campus environment in some cases. Areas including sports and recreation, academic spaces, security, energy, electrical, property, and landscapes experienced major upgrades.

By the virtue of being an institution and given the growing population of the university, study areas have ascended to human rights status. This has warranted an additional 24/7 study space on the Bloemfontein Campus. This new development provided a necessary diversion of traffic from the Sasol Library Study Labs during the year-end exam period.

According to Khati: “The space accommodates 80 students and is a collaborative learning facility since it is divided into different compartments such as discussion rooms and a larger open study space which is safe to study for longer hours.”

A student housing unit with 268 beds was built in the South Campus to accommodate undergraduate students. A new University Estates building, sports ablution facilities on the South Campus, which includes universal access, and tutorial venues on the Qwaqwa Campus were also successfully completed.

Projects currently under way

A 252- and 255-bed student housing project that will be connected to the existing grey water system is in progress on the South Campus. The new intake of students for the next academic year will be treated to luxury student living equipped with a heat pump.

In addition, a new hockey Astro Turf field was constructed at the Bloemfontein Campus to supplement the already existing facility, and the Naval Hill telescope sculpture and a viewing platform were installed.

Looking to the future

The university has been granted funding by the Department of Higher Education and Training for three projects on the Qwaqwa Campus and an additional three at the Bloemfontein Campus. These projects include residences, Student Lecturing Assessment Centres, as well as Language Development Centres.

News Archive

Juan Odendaal invited to training camp in Switzerland
2015-10-19

Juan Odendaal recently in action at the UCI Paralympic World Cup
for road races in Pietermaritzburg.
Photo: Bertus Odendaal

Juan Odendaal from the University of the Free State (UFS) was invited to be part of a training camp in Switzerland, together with some of the world’s leading para-cyclists.

This first-year BA student was recently selected by the cycling body, Union Cyclist International (UCI), to attend the camp which will be held in Aigle from 2-12 November 2015.

Afterwards, Odendaal, who has been the junior South African champion in the C3 division in road races, time trials, and pursuit races, will travel to Manchester, England, where he will compete in a para-cycling event from 13-15 November 2015.

Recently, he took part in the senior division of the UCI Paralympic World Cup for road races for the first time, and has performed well. In this event, which was held in Pietermaritzburg, he competed against participants from countries including Germany, Australia, Spain, and Russia.

Odendaal on 11 September 2015 took eighth place in the road race and tenth place in the time trial. The road race takes place over 55 km and the time trial over 24 km.

Odendaal said he realised immediately that he was competing at senior level.

“There was a marked difference in the quality of the races,” he said, about the World Cup in Pietermaritzburg.

“It was much faster than I had expected. The average speed was 37,2 kilometres per hour.”

Odendaal also made his debut for South Africa in March of this year at the UCI Para-cycling Track World Championships in Apeldoorn, The Netherlands. At this event, he finished in fifteenth place in both the time trials and the pursuit event.

Odendaal said his main goal is the World Championships, which will take place in Montichiari, Italiy, in March 2016. He is hoping to achieve good times there in order to qualify for the 2016 Olympics in Rio de Janeiro.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept