Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 December 2018 | Story Valentino Ndaba | Photo Supplied
Sport ablution South Cam
Sports ablution facilities at the South Campus will ensure universal access.

As part of its 2018 infrastructure expansion, the University of the Free State (UFS) launched three solar farms earlier this year. The solar farm in Bloemfontein is large enough to power up to 300 houses, while the Qwaqwa and South campuses had 750kWp ground-mounted solar systems installed. 

“The power generated from the solar systems will always take preference over the conventional Centlec power supply meaning less power will be used from the national grid,” said Maureen Khati, Assistant Director at Facilities Planning.

All these sites will be connected directly to the university’s medium voltage electrical grid, thus the power can be distributed to areas where needed. 

The year that was 

The solar farms formed part of 274 new developments which were planned for the year by the Department of University Estates. These covered all three campuses and the off-campus environment in some cases. Areas including sports and recreation, academic spaces, security, energy, electrical, property, and landscapes experienced major upgrades.

By the virtue of being an institution and given the growing population of the university, study areas have ascended to human rights status. This has warranted an additional 24/7 study space on the Bloemfontein Campus. This new development provided a necessary diversion of traffic from the Sasol Library Study Labs during the year-end exam period.

According to Khati: “The space accommodates 80 students and is a collaborative learning facility since it is divided into different compartments such as discussion rooms and a larger open study space which is safe to study for longer hours.”

A student housing unit with 268 beds was built in the South Campus to accommodate undergraduate students. A new University Estates building, sports ablution facilities on the South Campus, which includes universal access, and tutorial venues on the Qwaqwa Campus were also successfully completed.

Projects currently under way

A 252- and 255-bed student housing project that will be connected to the existing grey water system is in progress on the South Campus. The new intake of students for the next academic year will be treated to luxury student living equipped with a heat pump.

In addition, a new hockey Astro Turf field was constructed at the Bloemfontein Campus to supplement the already existing facility, and the Naval Hill telescope sculpture and a viewing platform were installed.

Looking to the future

The university has been granted funding by the Department of Higher Education and Training for three projects on the Qwaqwa Campus and an additional three at the Bloemfontein Campus. These projects include residences, Student Lecturing Assessment Centres, as well as Language Development Centres.

News Archive

State of our campuses: UFS Bloemfontein and South Campuses closed on Tuesday 20 September 2016
2016-09-19

After much consideration, the senior leadership of the University of the Free State (UFS) decided to close the Bloemfontein and South Campuses on Tuesday 20 September 2016.

Bloemfontein Campus:
No academic and administrative services will be available and no lectures and/or tests will take place.

The decision comes after all academic activities were suspended this afternoon because of a growing unease on campus and disruption of some academic activities by groups of students resulting from this morning’s announcement on tuition fees by the Minister of Higher Education and Training, Dr Blade Nzimande.

The closing of the campus will afford an opportunity to the senior leadership to further engage with the Student Representative Council (SRC).

South Campus:
Because of problems with bus transport from the Bloemfontein Campus to the South Campus, no academic services will be available tomorrow. No lectures and/or tests will therefore take place. Administrative services will, however, continue, and staff on the South Campus have to report for work.

Qwaqwa Campus:

Academic and administrative services on the Qwaqwa Campus will continue as normal tomorrow.

Information about the situation on the campuses will be shared as and when it becomes available during the course of tomorrow.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept