Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
02 October 2020 | Story Leonie Bolleurs | Photo Supplied
Prof Kahilu Kajimo-Shakantu believes there are a number of benefits and lessons that the construction industry can draw if they adopt technology that can lead to sustainable construction beyond the COVID-19 era.

The construction business has been hit hard, with various negative impacts on cost, implementation timelines, profits, and others. Increased and smart adoption of technology, however, can transform the sector to make it more sustainable. 

This is the belief of Prof Kahilu Kajimo-Shakantu, Head of the Department of Quantity Surveying and Construction Management at the University of the Free State (UFS).

As president of the Association of Schools of Construction of Southern Africa (ASOCSA), she delivered the welcoming address of the 14th Built Environment conference (21, 22 September 2020). Prof Kajimo-Shakantu is the sixth president of ASOCSA.

The theme of this year’s built-environment conference, presented for the very first time in a virtual format, was Technology, Transformation and Sustainable Construction.

Identify and harness opportunities 

“It is clear that while COVID-19 remains a challenge, opportunities can be identified and harnessed even by our own construction industry through the exploitation of technological, transformative, and sustainable practices. The technology and transformation taking place now – in South Africa and beyond this COVID-19 situation – should be embraced for competitive advantage, even after the pandemic disappears,” said Kajimo-Shakantu.

Clients, consultants, contractors, and suppliers of materials and services can wholly embrace technology and transformation for sustainable, cost-effective, less wasteful, and cleaner construction processes. – Prof Kahilu Kajimo-Shakantu


She also provided some practical suggestions: “Technologies such as remote monitoring of construction sites and selected construction site operations through high-definition cameras and robust software should be encouraged as a way of minimising health and safety risks and mobility costs during the project duration, and at the same time ensuring an all-time virtual presence on site for various purposes.”

“Virtual contract progress meetings, site meetings, and supervision of specialised work are some of the benefits that the construction industry could gain if they adopt technology that can lead to sustainable construction beyond the COVID-19 era,” she added. 

Encourage meaningful partnerships

It is no longer a case of business as usual. Prof Kajimo-Shakantu believes stronger collaboration and meaningful partnerships must be encouraged among all stakeholders if the conference theme is to be fully actualised for the benefit of the construction industry, as it races towards attaining sustainable construction.

She said: “Clients, consultants, contractors, and suppliers of materials and services can wholly embrace technology and transformation for sustainable, cost-effective, less wasteful, and cleaner construction processes.”

Many insightful and thought-provoking papers touching on construction industry challenges and opportunities, as well as the teaching and learning of students, were delivered by both local and international delegates. 

The conference is believed to be one of the major cutting-edge built-environment conferences on the African continent. 

A guest of honour at the event was the Vice-Rector: Academic at the University of the Free State, Dr Engela van Staden. In her welcome address, she challenged delegates to establish a consistent channel for disseminating some of the research outcomes to industry stakeholders, including the respective government departments. “It is time to go beyond building rich databases and prestigious publications for our universities,” she said.

Keynote speakers included Prof Monty Sutrisna, Professor of Construction and Project Management and the Head of the School of Built Environment at Massey University, New Zealand; Prof Obas John, Professor of Sustainability and Environmental Law and Director of Internationalisation at London South Bank University; Prof David Edwards, Professor of Plant and Machinery Management, Birmingham City University, England; and Dr Reza Hosseini, the Associate Head of School (research) in the School of Architecture and Built Environment, Deakin University, Australia.

The various interesting peer-reviewed research papers that were delivered, addressed topical issues that affect the built environment not only in South Africa, but also in the regions beyond.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept