Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
21 June 2021 Photo Supplied
Dr Robert Hansen
Dr Robert Hansen was recently appointed (31 May 2021) as Director of the Centre for Mineral Biogeochemistry in the Department of Geography. He believes that we as humans must try to make the world better.

With a mandate to promote the science of biogeochemistry in South Africa, the Centre for Mineral Biogeochemistry (CMBG) in the Faculty of Natural and Agricultural Sciences at the University of the Free State (UFS) is working nationally with industry teams in the mining and agricultural sectors to contribute towards sustainable agriculture and sanitary conditions for South Africans.

Dr Robert Hansen, recently appointed (31 May 2021) as Director of the centre, believes that we as humans must try to make the world better, and plans to carry this vision to the larger Southern African Development Community (SADC) as well as the international community.

A sustainable future for the planet
CMBG aims to use biogeochemistry as a tool to facilitate a sustainable future for humans and planet Earth. “We study the area where water, rock, the atmosphere, and life come together in a complex system. Many aspects of these interrelationships, such as the removal of pollutants from water, can be used to the advantage of human society in a sustainable manner, such as having little, and in some cases, no waste products,” explains Dr Hansen.

He says they will also be focusing on developing and rolling out new emerging biotechnologies, which can be used to help mitigate the polluting legacy of the past. “The idea is to research and develop new biotechnologies that will result in creative and innovative solutions for a sustainable global society,” he says.

The Mineral Biogeochemical Research Infrastructure Platform (BIOGRIP) node, established in 2019, is also housed in the centre. According to Dr Hansen, the centre is conducting integrated, multidisciplinary research through the BIOGRIP platform. Scientists are investigating how the interaction between natural elements can be used to practically improve the lives of South Africans, especially in areas plagued by dirty water.

Improving water quality in the region
He also envisions building collaborative networks with specialists within the university, as well as with external organs of government and the private sector, both at national and international level, to increase the centre’s knowledge and application of biogeochemistry, ensuring a sustainable future for all.

In one of their more recent projects, the centre is working in the agricultural sector as part of a research team with the farming company, ZZ2, striving to ensure sustainable agriculture for the future.

In another project, they started with a multidisciplinary initiative on the biogeochemistry of the Welkom wetlands, with the aim of improving water quality in the region. “The project is still in its initial phases, but we are all very excited about it and the possibilities for improving the lives of local communities,” he says.

Dr Hansen, who is very pleased with the autonomy he and his team have received in pursuing projects and objectives with respect to academic research as well as industry initiatives, is really excited about the centre as a whole and where they are heading.

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept