Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 April 2019 | Story Mamosa Makaya
National Lotteries Commission
Front row from the left: Dr MA Madzivhandila (board member), Prof YN Gordhan (board member), Ms Charlotte Mampane (Commissioner), Prof D Coetzee (South Campus Principal), Ms Bish B Ramahlele (Director: Community Engagement) Back row from the left T Mandyu (Provincial Manager), Prof NA Nevhutanda (Chairman of the Board), Mr F Van Der Wat (Deputy Director: KovsieSport)

The University of the Free State (UFS) has over many years embarked on developmental projects to improve and upgrade its sports facilities, sports research, medical research, arts and cultural programmes and community focused programmes. These projects were made possible with the financial support of the National Lotteries Commission (NLC) which has provided funding through grants to the UFS since 2006. The UFS office of Institutional Advancement (IA) hosted the NLC on the Bloemfontein Campus on 5 April 2019, where a presentation on the success of projects was made. The role of the IA office is to ensure that the university complies with reporting requirements set out in the grant agreements and that the university maintains good relations with the NLC over the long term.

Funding fortifies UFS projects
Feedback on the success and impact of various projects was presented, such as the visual arts project. This includes the public sculpture project funded with over R3 million in 2009, which brought about the creation of outdoor sculptures that can be seen on the university grounds produced by local and regional sculptors. Feedback was provided by Ms Angela de Jesus, Curator, UFS Arts Collection and Assistant Director: Johannes Stegmann Gallery.  

In 2010 the NLC funded the upgrading of the UFS swimming pool for more than R2 million. The pool was rebuilt to bring it up to Olympic standards, allowing UFS students to have a facility at which to train for international swimming competitions. Feedback on the project was provided by Mr Frans van der Wat, Deputy Director: KovsieSport. Other funded projects are the Khoisan early learning centre, which teaches young learners on the history and culture of the “first people” of South Africa, and the Arts in Schools Project, which were both funded in 2009 for more than R6 million combined. More funded projects include the upgrading of the Johannes Stegmann Gallery in 2017, research into swimming in the Free State, and equipment for the South African Doping Control Laboratory (SADOCol), which is the only laboratory of its kind in Africa, which were funded between 2010 and 2012, totalling R4.8million.

Community development and engaged scholarship
After the change in the mandate of the Provincial Arts Council of the Free State (PACOFS) after 1996, many local dramatic arts professionals in the province were faced with dwindling work opportunities. The UFS, through the Department of Drama and Theatre Arts, stepped in to create arts programmes that would help develop and retain the skills of local performers and playwrights and an opportunity for them to be trained and directed by UFS and industry-based professional directors. 

Prof Nico Luwes, from the UFS Department of Drama and Theatre Arts, said: “I initiated the formation of the Free State Theatre Acts (FACTS) as a section 21 Company with committee members from UFS staff and local actors, with the aim of creating work for professional actors in the greater Bloemfontein area.” A combination of grants from the NLC and the UFS Department of Drama, between 2006 and 2010 resulted in 19 professional plays and four professional musicals, performed by Free State professional artists including community players from Heidedal, Botshabelo and drama students, using English, Afrikaans and Sesotho. These initiatives brought together students and artists from different linguistic and cultural backgrounds, who worked together to perform at local and national arts festivals. Although the NLC will not be funding arts and culture projects at universities in the 2019-2020 financial year, the university is hopeful to be considered in the future.

The UFS and NLC have had a successful working relationship and the feedback session aimed to strengthen the ties between them. Members of the board of the NLC expressed pride at how the UFS has developed not only its own projects, but the Free State community as well. The team was treated to an art exhibition of the work of Cape Town-based artist Ieshaan Adams at the Johannes Stegmann gallery.

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept