Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
10 December 2019 | Story Ruan Bruwer | Photo Supplied
Tennis
The members of the Kovsie tennis team are, from the left, front: Danique Reynders, Reze Opperman, Daniel de Villiers, Ester de Kock, Lienke de Kock, Anandhi Botha, and Janine de Kock (team manager); back: Marnus Kleinhans (coach), Heinrich Willemse, Emke Kruger, Arne Nel, Ryk Kleinhans, Handre Hoffman, and Ruben Kruger.

The country’s number one student team and South Africa’s second-best club. This is the bragging rights earned by the University of the Free State’s (UFS) tennis team after winning the 2019 University Sport South Africa (USSA) Tennis Championship. 

The Kovsie team claimed their ninth consecutive USSA title on Friday 6 December in Stellenbosch, winning all their matches. The team comprised both men and women – a combination which has been in place since 2010. Since 2010, there has been only one name on the USSA trophy, with the Kovsie team winning from 2010 to 2015 and again from 2017 to 2019. The competition was not hosted in 2016.   

In the 2019 USSA final against Maties, Kovsies was declared the winner, with the score 7-1 after completing seven singles matches and one doubles. A match consisted of four men’s singles, four women’s singles, two men’s doubles, two women’s doubles, and two mixed doubles. 

Arne Nel, Ruben Kruger, Handre Hoffman, Heinrich Willemse, Ester de Kock, and Reze Opperman all won their singles in straight sets. Kruger and Willemse combined for a win in the only doubles match.

On their road to victory, the team had wins over the North-West University (Mafikeng Campus), the University of Cape Town, Stellenbosch University, and the University of Pretoria. The victory over the University of Pretoria in the semi-final was revenge for the Sun City University Championship in March, where they denied Kovsies a fourth consecutive crown in that competition.

Another feather in the cap for Kovsie tennis was that two team members, Willemse and Kruger, along with two management members – Marnus Kleinhans and Janine de Kock, respectively UFS tennis coach and team manager – were chosen for the South African team to the World Student Games in July. 

 



News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept