Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
15 July 2019 | Story Eugene Seegers | Photo Eugene Seegers
Chris Grobler, Eunice Qwelane, Bob Tladi, and Elmien Retief on the UFS South Campus during the Monyetla Bursary Project’s Winter School.
Chris Grobler, Eunice Qwelane, Bob Tladi, and Elmien Retief on the UFS South Campus during the Monyetla Bursary Project’s Winter School.

Three members of the Free State Department of Education (FSDoE) recently visited the UFS South Campus to see an example of inclusive education at work: The Monyetla Bursary Project’s sixth Winter School. Monyetla means ‘opportunity’ in Sesotho. We spoke to Bob Tladi (Chief Director: Education Development and Support, FSDoE), Eunice Qwelane (Director: Inclusive and Special-Needs Education, FSDoE), Elmien Retief (Acting CES, Inclusive and Special-Needs Education, FSDoE), and Chris Grobler (Director: Monyetla Bursary Project) to find out why this year’s programme was of special interest to the province’s Department of Education.

According to Eunice Qwelane, the special area of interest for her department was the hard-of-hearing and deaf Grade 12 learners from Bartimea School in Thaba Nchu. She says the Winter School is “an opportunity for these disabled learners to be integrated into the broader school community. For them, it is also a step of progressive development towards their future, as well as preparation for tertiary education.” She adds that it is also an opportunity for them to receive excellent tuition. “Monyetla’s Winter School at the UFS South Campus ensures that subjects are taught by the best possible educators.”

Chris Grobler mentions that additional opportunities were created for these learners to interact with hearing learners. During their time off at the cafeteria or during breaks, they can play games and get to know one another. Hearing learners were also taught basic greetings in South African Sign Language (SASL) and were encouraged to interact with deaf students as much as possible.

He adds: “There is a need for administrators to develop and widen their thinking. Schools that attend the Winter School are from all over the province, not only Motheo District in the Free State. Even more than that, learners visit from all over the country — from the North-West, KwaZulu-Natal, Eastern, Western and Northern Cape — because we have built a reputation here. As the University of the Free State, we are doing good towards ALL. It is a compliment for the Free State Department of Education and the university.”

Eunice Qwelane concludes: “We really appreciate what the UFS is doing, because within the department we do not have winter camps that cater for visually or hearing-impaired learners. The university, in collaboration with the Monyetla Bursary Project, is solving an existing problem and bridging a gap in the system. It is an inspiration for these learners, because they can move away from isolation. This is inclusivity at its best and inclusivity in action that the UFS is bringing to us as a department, and we really appreciate that.”

Other services rendered at Winter School 

1) Help learners apply to UFS (feeder programme of matrics for UFS in collaboration with Schools Partnership Project at South Campus)
2) NBT application assistance
3) Funding opportunities, application assistance
4) Job shadowing / internships, partnerships with companies and sponsors
5) South African Sign Language (SASL) interpreting at Computer Lab
6) Simoné Hendricks: SASL Specialist interprets SASL in Maths and Accounting
7) D6 School Communicator — download teaching resources used during Winter School

Winter and Saturday Schools: Facts

  • 2007: Saturday School started with 300 learners and five subjects
  • 2019: This has grown to 1 500 learners and 15 subjects in 2019
  • 2008-2011: Gr 12 learners express a need for further opportunities to improve their skills in key subjects such as Maths, English, Science, and Computer Literacy
  • 2012: Winter School is started by Monyetla Bursary Project, with the aim of linking corporate sponsors with deserving underprivileged learners
  • 2019: Winter School has now grown to be a multi-province drawcard to the UFS South Campus


News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept