Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
02 July 2019 | Story Leonie Bolleurs
Edwin Skhosana
Edwin Skhosana is working hard to become a successful and competent actuary one day. With him is his lecturer, Dr Michael von Maltitz.

Edwin Skhosana, an Actuarial Sciences student, was described by his lecturer, Dr Michael von Maltitz of the Department of Mathematical Statistics and Actuarial Science, as ‘very quiet’ in his Causal Inference class. 

This may sound like a compliment, but it’s not.

For Dr Von Maltitz, being quiet is definitely not encouraged – not with the new teaching methods applied in class.

“See, my class is all about engagement – getting the students to watch videos on the topics, read about the methods in question, and then come to class to grill me about things they don’t understand. This change in teaching method is extremely disconcerting for many Mathematical students, who have up until now only been taught in the ‘memorise-regurgitate’ form they had ever since the start of high school,” he explains.

Future success


“My goal is to get the students to a level of understanding where they can sit down with me or with an expert in the field and have a conversation about the Mathematical Statistics topics that I teach. This is a very difficult task in such a technical module, and few students ever feel comfortable enough to engage with me actively in class in this way,” Dr Von Maltitz points out. 

Edwin is working hard towards applying the skills and knowledge he has obtained at university to become a successful and competent actuary one day. 

An important turning point was when it dawned on him how the things discussed in class could find an important practical application in so many fields.  

“This suddenly drove a spontaneous fascination in my mind that led me to engage with Dr Von Maltitz,” the previously quiet Edwin explains.

And everything changed.

Desperate to learn

Dr Von Maltitz explains: “Edwin came to my office to ask some questions. The incredible thing was that he sat down, and a conversation about the Mathematics, the foundations, and the methods just flowed between us. I have seldom had such an insightful chat about my module with a student. It was like a cascade of information just fell into place for Edwin.”

Although he sometimes still experiences his studies as challenging and grapples to adapt to the various styles of lecturing from different lecturers, Edwin now has hope for his class in Causal Inference. 

“I think Dr Von Maltitz’s way of presenting in class is excellent. It is, however, hard to grasp if you are still anchored in the old way of cramming, because he wants you to understand and be able to apply what he teaches,” says Edwin.

“It was just wonderfully refreshing to see someone so desperate to learn something (rather than just wanting to get a degree), and then actually managing to turn around a bad semester mark into such a river of understanding,” Dr Von Maltitz concludes.

Dr Michael von Maltitz
Dr Micheal von Maltitz

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 