Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 March 2019 | Story Rulanzen Martin | Photo Rulanzen Martin
Rapport Regstreeks
From the left: Dr Ina Gouws, Dr Sethulego Matebesi, Dr Ebrahim Fakir, and Waldimar Pelser, who facilitated the panel discussion on the upcoming national elections.

Since the national elections of 2014 five years ago, several issues have occurred that could have an impact on the upcoming elections. A panel consisting of Dr Ina Gouws from the Department of Governance and Political Transformation, Dr Sethulego Matebesi from the Department of Sociology – both at the University of the Free State (UFS), and Dr Ebrahim Fakir from Governance Institutions and Processes at the Electoral Institute for Sustainable Democracy in Africa, talked about these and other issues.

The panel discussion, facilitated by Waldimar Pelser, editor of Rapport, took place at the UFS on 8 March 2019. Rapport Regstreeks is presented by kykNET and Rapport.

Three factors that can handicap ruling party

“Does the ruling party have anything to be worried about?” Pelser asked, getting straight to the point. “Yes. The ruling party has a lot to be worried about. The reason for this is that voter participation has declined; secondly, there is definitely a management problem which resulted in a credibility crisis in the government; and lastly, the ANC is trying to keep people together who do not believe in the same issues,” Dr Fakir was the first to reply.

The issues mentioned by Dr Fakir have been a problem before. “Since 2016 there has been a lot of division within the ANC,” Dr Gouws said. “These divisions can have a huge impact on the outcome of the election. The divisions were exposed even more by the Nenegate situation, and the ANC could no longer manage it."

The fact that the ANC lost control over four of the major metros in the 2016 local elections must be worrying to them.

Zondo Commission and opposition parties

The Zondo Commission, with its appalling revelations has uncovered the magnitude of state capture and the shocking testimonies that have emerged, could possibly hamper the ANC in the elections. “Political parties have supporters, regardless of internal problems. Loyal party members will still vote for their parties,” said Dr Matebesi. “The promise of RDP houses before an election is the bread and butter of many voters; therefore, they will vote ANC again.”

With the rise of the Economic Freedom Fighters (EFF), the support base of the ANC has also dwindled. “If there is one party with a colonial mentality, it is the EFF. They are undermining democracy, thrive on divisions in society and exploit them,” said Dr Fakir. “They jump in on many issues for their own gain,” Dr Gouws added.

As for the Democratic Alliance (DA), Dr Gouws said its governance is ‘fantastic’ compared to the ANC, although not always 100%. “Problems were however highlighted – it is not 100% and I think they should attend to the problems.”

News Archive

Major infrastructure development planned for three campuses
2014-01-06

 

DHET Sound Studio, African Languages and Humanities projects.
More students will be accommodated on our campuses, with two new residences being built on the Qwaqwa and Bloemfontein Campuses respectively. The residences are part of a grant received by the Department of Higher Education and Training (DHET).

The new residences will accommodate 250 students each and the planned completion date is end of 2014.

Other major projects planned for the three campuses are a Student Life Centre on the Qwaqwa Campus, new lecture halls for the South Campus and a new sound studio on the Bloemfontein Campus. The sound studio will be erected where the old squash courts used to be.

The Department of Physical Planning stated the aim is to create a facility that can house a recording studio that will function as a multi-purpose centre where students can get practical experience in sound and visual recording. Albie Louw, Chief Officer: Property Management in the Department of Physical Planning, says the studio will have a screening room, a multi-camera recording studio, editing room, video- and audio-control room and lecture-recording studios.

The projects have different completion dates, but all fall within the 2013/2014 and 2014/2015 financial years.

On the Qwaqwa Campus, the existing amphitheatre in front of the library will get a roof, so that it can be used more effectively and be more accessible. It will create a new active open space that can be utilised by students for informal study, a social space and for formal functions or promotions.

Other facilities to be upgraded include the electrical infrastructure on the Qwaqwa Campus. Disability access on the campus will also be improved.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept