Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 March 2019 | Story Rulanzen Martin | Photo Rulanzen Martin
Rapport Regstreeks
From the left: Dr Ina Gouws, Dr Sethulego Matebesi, Dr Ebrahim Fakir, and Waldimar Pelser, who facilitated the panel discussion on the upcoming national elections.

Since the national elections of 2014 five years ago, several issues have occurred that could have an impact on the upcoming elections. A panel consisting of Dr Ina Gouws from the Department of Governance and Political Transformation, Dr Sethulego Matebesi from the Department of Sociology – both at the University of the Free State (UFS), and Dr Ebrahim Fakir from Governance Institutions and Processes at the Electoral Institute for Sustainable Democracy in Africa, talked about these and other issues.

The panel discussion, facilitated by Waldimar Pelser, editor of Rapport, took place at the UFS on 8 March 2019. Rapport Regstreeks is presented by kykNET and Rapport.

Three factors that can handicap ruling party

“Does the ruling party have anything to be worried about?” Pelser asked, getting straight to the point. “Yes. The ruling party has a lot to be worried about. The reason for this is that voter participation has declined; secondly, there is definitely a management problem which resulted in a credibility crisis in the government; and lastly, the ANC is trying to keep people together who do not believe in the same issues,” Dr Fakir was the first to reply.

The issues mentioned by Dr Fakir have been a problem before. “Since 2016 there has been a lot of division within the ANC,” Dr Gouws said. “These divisions can have a huge impact on the outcome of the election. The divisions were exposed even more by the Nenegate situation, and the ANC could no longer manage it."

The fact that the ANC lost control over four of the major metros in the 2016 local elections must be worrying to them.

Zondo Commission and opposition parties

The Zondo Commission, with its appalling revelations has uncovered the magnitude of state capture and the shocking testimonies that have emerged, could possibly hamper the ANC in the elections. “Political parties have supporters, regardless of internal problems. Loyal party members will still vote for their parties,” said Dr Matebesi. “The promise of RDP houses before an election is the bread and butter of many voters; therefore, they will vote ANC again.”

With the rise of the Economic Freedom Fighters (EFF), the support base of the ANC has also dwindled. “If there is one party with a colonial mentality, it is the EFF. They are undermining democracy, thrive on divisions in society and exploit them,” said Dr Fakir. “They jump in on many issues for their own gain,” Dr Gouws added.

As for the Democratic Alliance (DA), Dr Gouws said its governance is ‘fantastic’ compared to the ANC, although not always 100%. “Problems were however highlighted – it is not 100% and I think they should attend to the problems.”

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept