Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
28 November 2019 | Story Rulanzen Martin | Photo Dr Peet van Aardt
iCAN read more
The book was launched during the Student Arts and Life Dialogues Festival on the Bloemfontein Campus in October.

In its continued bid to decolonise the academic curriculum at the University of the Free State (UFS) the Centre for Teaching and Learning (CTL) published the second volume of Creative African Narratives (iCAN) short stories written by UFS students. 

iCAN Volume 2 comes after extensive creative writing workshops were presented on all three campuses during the year. The project is coordinated by Dr Peet van Aardt from CTL and is funded by the Andrew W Mellon Foundation

Through the iCAN project, CTL plans to incorporate the students’ written texts as part of the extensive reading component of the first-year academic literacy courses across all faculties. “We are teaching and motivating our students to read, but we cannot keep relying on a curriculum that is foreign to them,” said Dr Van Aardt.

The volume comprises 55 short stories with topics ranging from the Struggle, to campus life, mental illness, family affairs and love, with the students’ lived experiences also a main theme throughout the anthology. The stories are written in Sepedi, isiZulu, Setswana, English, Afrikaans and Sesotho. Some were also performed at the recent Multilingual Mokete, held on the Bloemfontein campus in September.

“We are really proud of this year’s publication, and the project as a whole,” says Dr Van Aardt. “This year we were able to include more student contributions than last year.”

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.

More information, guidelines and contact numbers

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept