Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
01 October 2019 | Story Nikile Ntsababa (Registrar)

The nomination process for the election of two representatives to serve on the UFS Council was finalised on Tuesday, 17 September 2019 – the closing date for nominations.
 
Here are the names of the nominees (listed alphabetically):
 
Representative from the Qwaqwa Campus:
None
 
Other representative:
Mr Christo Dippenaar
Dr Pieter du Toit
Mr Lefa Mabaso
Dr Walter Matli
Mr Zama Sigwebela
 
Please note that no nominations were received for representatives from the Qwaqwa Campus.  Since this scenario is not legislated in the Statute, Institutional Rules, and Convocation Constitution, the Registrar will, after consultation with the President of the Convocation, open another round of nominations for Qwaqwa representatives to Council (with the closing date 8 October 2019) to ensure that the campus is also represented on Council.
 
Convocation and Alumni members from the Qwaqwa Campus are therefore given a second opportunity to nominate one representative from among their members for the Qwaqwa Campus.  All nominations must reach the office of the Registrar no later than 16:30 on Wednesday, 9 October 2019.
 
Every nomination form  shall be signed by four (4) members of the Convocation and shall contain the written acceptance of the nomination by the nominee under his/her signature as well as an abridged CV and a motivation of more or less 200 words.
 
Nominations are to be submitted to:  email: registrar@ufs.ac.za or delivered by hand to Nikile Ntsababa, Main Building, Room 51, Bloemfontein Campus.
 
Kindly take note that late or incomplete nominations will not be accepted or considered.
 
Further information regarding the election process will follow in due course.

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.

More information, guidelines and contact numbers

 

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept