Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
14 October 2019 | Story Rulanzen Martin | Photo Sonia Small
OSM Camerata
The OSM Camerata also performed at the Rector’s Concert on 6 September under direction of conductor Elsabe Raath.


The Odeion School of Music Camerata (OSMC) is one of the flagship music ensembles at the University of the Free State (UFS). Its reputation as one of the country’s top student chamber ensembles far equlas its impeccable music.

At the end of September the Camerata undertook a tour with concerts in Pretoria and Johannesburg. They held a concert in the new Javett Arts Centre at the University of Pretoria (UP) where they presented a lunch-hour concert which featured modern musical arrangements. At a gala concert, on 28 September 2019, which was hosted in the Musaion Concert hall at UP they collaborated with the UP Department of Music and the Gauteng Chamber Music Festival.  

The last leg of the tour ended at the University of the Witwatersrand Atrium on 29 September 2019. According Marius Coetzee, innovation manager at the OSM: “it is important to go on tour in order to recruit new outstanding students and to showcase the excellence of the Camerata and the Odeion School of Music.” 

The OSMC has also forged a professional internship with the Cape Philharmonic Orchestra to solidify and advance the skills of the young orchestral musicians. 

The OSMC was also the 2017 and 2018 winner of the International Ictus Music competition.  

The OSMC was strategically founded by Marius Coetzee to serve as a feasible incubator for nurturing of fully rounded musicians who are thoroughly prepared for the demands of their trade as orchestral musicians, soloists and conductors.  

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept