Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
04 September 2019 | Story Leonie Bolleurs | Photo Charl Devenish
Jon Jacobson
Delivering the 31st Sophia Gray Memorial Lecture and Exhibition in Bloemfontein, was Jon Jacobson from Metropolis Design in Cape Town.

What is inside and what is outside? What is coming alive in the light? Minimalism. Hugeness. Shadows. Soft. Art. Complex. Conversation. Ambiguity. Clarity. All phrases and words used by the most recent Sophia Gray laureate, Jon Jacobson from Metropolis Design in Cape Town, to describe aspects of his work.

He delivered the 31st Sophia Gray memorial lecture in Bloemfontein. The name of his lecture at this prestigious event, organised by the UUFS Department of Architecture, was in [de] finite. Jacobson is the first graduate in the department’s MArch with Design.

Nature plays a big role in many of his projects, with a blurred distinction between the inside and the outside of the structures he builds. His designs fulfil the desire of a union with nature. 

A detailed investigation

Jacobson creates places and spaces to celebrate being. “Architecture is undeniably art, but it is also embodied in the completeness of the lived moment,” he says. 

Every project starts with a detailed investigation. “What social theory will we engage with? How progressive is it? What attitude will we take to the environment, to the theory of family? What other personal concerns will we be worried about? It is important to engage critically with this information. Important to build a philosophical base for each project,” says Jacobson.

He also believes it is important to consciously ensure that form follows idea with the same intensity that it follows function and that it does not blindly follow other form. 

At Metropolis, Jon and his team are client centred in their approach to design. Jon explains the process: “Some of the content is brought from the client’s personal and social aspiration and some from contemporary architecture culture, but the most potent component is the hidden set of ideas that emerge from our own engagements with the living world such as popular science, geology, art, music, literature, philosophy, theology, mysticism, and many others. And this emerges in the hidden sense of the word, in its architecture content.”

Content approach to design

In house design, Jon categorises the content that informs the architecture of the house: content pertaining to the individual, their philosophy, values and beliefs, content derived from culture, architecture and the arts, passion, religion, politics, and content referring to the natural world and its processes. Content from each of these spheres is present in any of his work. 

Jon says a major implication of a content approach to design is that it requires a design framework that is largely operative at a level of idea rather than at the level of form. This contributes to creating architecture rather than just buildings. 

His design method allows conscious control over the relationship between the ideas, the forms, and the poetics of the projects. “And at any point in the building process, it is possible to trace back and to critically assess whether any particular form is aligning with the core ideas of the project,” Jon indicates. 

Jon’s first taste of grappling with the infinite of architecture was with a garden pavilion he built for rest and relaxation. “For the first time I felt that we integrated planning, content, sight, programme, structure, and materiality into one unified whole that was expressed with a minimum of means and that was more than just the sum of its part,” he states.

He strongly believes that the individual is at the centre of every architectural project. He says the belief systems, type of social needs, family dynamics, physical habits, and spatial practices of their clients need to be investigated in detail in order to facilitate a meaningful spatial experience.

He continues: “We see our role as designers to saturate the environment with the meaning that enhances our clients’ daily experience in every possible way – from the ergonomic and the practical to the spiritual. In the process, the logics and tradition of architecture and the ego of the architect sometimes need to make way for human need and aspiration.”


News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication