Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
04 September 2019 | Story Leonie Bolleurs | Photo Charl Devenish
Jon Jacobson
Delivering the 31st Sophia Gray Memorial Lecture and Exhibition in Bloemfontein, was Jon Jacobson from Metropolis Design in Cape Town.

What is inside and what is outside? What is coming alive in the light? Minimalism. Hugeness. Shadows. Soft. Art. Complex. Conversation. Ambiguity. Clarity. All phrases and words used by the most recent Sophia Gray laureate, Jon Jacobson from Metropolis Design in Cape Town, to describe aspects of his work.

He delivered the 31st Sophia Gray memorial lecture in Bloemfontein. The name of his lecture at this prestigious event, organised by the UUFS Department of Architecture, was in [de] finite. Jacobson is the first graduate in the department’s MArch with Design.

Nature plays a big role in many of his projects, with a blurred distinction between the inside and the outside of the structures he builds. His designs fulfil the desire of a union with nature. 

A detailed investigation

Jacobson creates places and spaces to celebrate being. “Architecture is undeniably art, but it is also embodied in the completeness of the lived moment,” he says. 

Every project starts with a detailed investigation. “What social theory will we engage with? How progressive is it? What attitude will we take to the environment, to the theory of family? What other personal concerns will we be worried about? It is important to engage critically with this information. Important to build a philosophical base for each project,” says Jacobson.

He also believes it is important to consciously ensure that form follows idea with the same intensity that it follows function and that it does not blindly follow other form. 

At Metropolis, Jon and his team are client centred in their approach to design. Jon explains the process: “Some of the content is brought from the client’s personal and social aspiration and some from contemporary architecture culture, but the most potent component is the hidden set of ideas that emerge from our own engagements with the living world such as popular science, geology, art, music, literature, philosophy, theology, mysticism, and many others. And this emerges in the hidden sense of the word, in its architecture content.”

Content approach to design

In house design, Jon categorises the content that informs the architecture of the house: content pertaining to the individual, their philosophy, values and beliefs, content derived from culture, architecture and the arts, passion, religion, politics, and content referring to the natural world and its processes. Content from each of these spheres is present in any of his work. 

Jon says a major implication of a content approach to design is that it requires a design framework that is largely operative at a level of idea rather than at the level of form. This contributes to creating architecture rather than just buildings. 

His design method allows conscious control over the relationship between the ideas, the forms, and the poetics of the projects. “And at any point in the building process, it is possible to trace back and to critically assess whether any particular form is aligning with the core ideas of the project,” Jon indicates. 

Jon’s first taste of grappling with the infinite of architecture was with a garden pavilion he built for rest and relaxation. “For the first time I felt that we integrated planning, content, sight, programme, structure, and materiality into one unified whole that was expressed with a minimum of means and that was more than just the sum of its part,” he states.

He strongly believes that the individual is at the centre of every architectural project. He says the belief systems, type of social needs, family dynamics, physical habits, and spatial practices of their clients need to be investigated in detail in order to facilitate a meaningful spatial experience.

He continues: “We see our role as designers to saturate the environment with the meaning that enhances our clients’ daily experience in every possible way – from the ergonomic and the practical to the spiritual. In the process, the logics and tradition of architecture and the ego of the architect sometimes need to make way for human need and aspiration.”


News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept