Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
01 September 2019 | Story Xolisa Mnukwa
Esihle Mhluzi
“As a small-town girl from the Eastern Cape, the only thing I have ever inculcated within myself was the validity of my dreams.” – Esihle Mhluzi #WomenOfKovsies

“I was determined to be more than just ‘the girl on crutches’; I wanted my brilliance to speak for itself,” said Mhluzi in response to the question, “What inspires you?”

As part of its #WomenOfKovsies campaign for 2019, which profiles inspiring women on our three campuses, the UFS celebrates LLB Law student, Esihle Mhluzi. She has served on a few SRC executive committees, UFS women empowerment organisations, and is also the Chairperson of the Universal Access Council for 2019.

Mhluzi says she was ‘graced’ with a physical impairment at the age of 10. She uses the word ‘grace’, because she appreciates what it means for the world and for women today to be in a body like hers. She also recently started pursuing a career in modelling, forming part of the top five of Miss Capable SA, and is currently one of the finalists for Face of Free State Fashion Week 2019.

Mhluzi explains that her decision to pursue modelling was propelled by her rationale to infiltrate spaces that were not necessarily designed for girls who ‘looked’ like her. She found that society seldom embraces and ‘accepts’ young women of her calibre on prestigious modelling platforms. Her mission is to ensure that she becomes the voice for the many women she represents. “With my additional modelling career path, I envisage us – women – running towards victory hand in hand,” said Mhluzi.

For her, being a woman means “being empty of yourself in order to create a better life for your fellow sister”. She believes a woman’s purpose is to extend grace and create safe spaces for each other to exist, heal, overcome, and conquer the world together, being in control of your narrative, and starving the noise. “Being a woman means having the audacity to be unapologetic in your brilliance,” she enthuses.

Mhluzi, who describes herself as ‘multifaceted’, believes that Women’s Month should be celebrated in order to pay homage to the phenomenal women who went before us. She highlights the importance of picking up where they left off. 

“I look forward to the day when being a woman simply means BEING.”

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.