Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
31 August 2020 | Story Xolisa Mnukwa
SRC election term extended

SRC elections 2020/21 were due to take place before the end of August 2020 as prescribed by the ISRC constitution. However, owing to the COVID-19 pandemic, and the consequent lockdown regulations and extension of the UFS 2020 academic year, the current SRC term will be extended until March 2021.

The decision to extend the term of the SRC was taken by the Rectorate following a recommendation made by the Division of Student Affairs (DSA), after consultation with
the ISRC. 

The consultation process with the ISRC produced three options:
  • Proceed with SRC elections in August 2020;
  • Extend the current SRC term to align with the extended 2020 academic year; or
  • Elect a Transitional Student Council (TSC) from September 2020 to March 2021.
In view of the above, and considering current conditions amid the coronavirus pandemic,
online SRC elections are scheduled for March 2021. 

This extension implies that the terms of all the sub-structures of the ISRC will be extended accordingly.

This communication serves as official notice to the Student Body about the extension of the
2019/2020 ISRC term and all its sub-structures as per the prescripts of the ISRC Constitution.

The DSA, with particular reference to the Student Governance Office (SGO), remains
committed to engaging with all parties of legitimate interest about matters arising from,
related to, and/or about SRC elections in all its permutations. 

Should you have any questions or comments, please feel free to contact the SGO:
Coordinator: Kamogelo Dithebe (DithebeKS@ufs.ac.za)
Faculty Coordinator: (MunzheleleD@ufs.ac.za)
Administrator: Rethabile Motseki (MotsekiR@ufs.ac.za)

News Archive

How to interpret Centlec’s load shedding
2008-01-31

Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:

Time slots
See the following table for an indication of times when load shedding might be applied to specific areas:  http://www.centlec.co.za/power_shed/PDF/time_slots.pdf

Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf

According to the document, the university resorts under group 4. In the table with time slots it is the grey area.

Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.

Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”

Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept