Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
20 August 2020 | Story Dr Nadine Lake | Photo Supplied
Dr Nadine Lake is a lecturer and Programme Director of the Gender Studies programme in the Centre for Gender and Africa Studies

The transition to democracy in South Africa has been characterised by an uphill battle towards equality. Inequalities shaped by race, gender, and class politics have been amplified since the outbreak of COVID-19. While South Africans initially thought they might be spared the devastation wrought by the virus, it is now certain that nobody is immune, regardless of race, class, age, gender, or social location. In an unprecedented manner, South Africans have become accustomed to hearing from government through President Cyril Ramaphosa’s state addresses on COVID-19 and its spread throughout the country. Although the initial national addresses were regarded as a panacea for some in a time of uncertainty, they are increasingly considered ignorant of broader human rights and the future of the populace. The South African situation is different from those struggling with the pandemic in the Global North, because of structural inequalities that have exacerbated an already precarious outlook on the economic and social stability of the country.

Gender-based violence needs immediate attention

In addition to recently emphasising a zero-tolerance attitude towards corruption in South Africa, President Ramaphosa surprised the nation when he emphasised that our country is dealing with two pandemics. First, COVID-19 has laid bare the slow pace of economic transformation and a crumbling health infrastructure. Second, gender-based violence has emerged as something that needs immediate attention. While it is true that gender-based violence has been and remains a burning issue in the country, it is important to identify the paradox that exists between the liberal agenda couched in the language of women’s rights on the one hand, and the blind eye turned towards slow economic transformation and high unemployment on the other. This emphasis on a liberal political agenda during a time of crisis is not new and has formed part of what we have come to know as political pinkwashing in Western democracies. Pinkwashing has been defined as a practice whereby states seek to create a more positive image of their nation, government, and human rights record, among other things, by speaking about and promoting LGBT rights (Lind, 2014, p. 602). While the African National Congress (ANC) may not be ready to fly the rainbow flag, it is worth noting the tensions between human rights and women’s rights, which have become part of political discourse, or more accurately, politicking. 

GBV and rape culture part of the social fabric

South Africa is reported as the country with the highest rape statistics in the world. In 2018/2019, the South African Police Services reported 52 420 cases of sexual offences. Non-profit organisations such as the One in Nine Campaign, however, highlight that only one in nine women report a sexual offence, and therefore a realistic estimate is likely much higher than the recorded statistics. Furthermore, according to a survey conducted by the South African Medical Research Council, one in four South African men have admitted to committing rape. These statistics demonstrate that gender-based violence and rape culture form part of the social fabric and that women are disproportionately affected by violence. In the first week of the South African lockdown, more than 87 000 cases of gender-based violence complaints were reported. One of the rape cases that received prominent media attention during the first phase of the lockdown, was that of a police officer who raped his wife. The Minister of Police, Bheki Cele, quickly gained the reputation of a rape apologist when he stated that the man who raped his wife was her husband and not the police, because he was not in a police uniform, and the rape did not happen at the police station. This absurd response reinforces common rape myths and reduces the seriousness of sexual offences. Although opposition political parties such as the Democratic Alliance (DA) have called for the removal of Minister Cele, who was deemed unfit for office, these calls have fallen on deaf ears. The message conveyed is that men in positions of authority are exempt from punishment and speak and act with impunity when it comes to sexual violence. 

#MeToo

Gender-based violence and rape is not specific to South Africa. The normative position of violence against women is widespread and deeply entrenched in institutions, cultures, and traditions worldwide. Movements such as #MeToo, which emerged in 2017 as an outcry against sexual violence and abuse, gained rapid momentum and started to see the prosecution of sexual predators such as Harvey Weinstein and Jeffrey Epstein in the United States. The global solidarity against sexual abuse shown by women on social media has shown that relentless pressure on patriarchal systems forces accountability, and refuses men permission to perpetrate violence against women with impunity.

As we reflect on Women’s Month 2020 in South Africa, it is necessary to observe a moment of silence to victims of sexual abuse and femicide. We pay respect to Fezekile Khuzwayo, Uyinene Mrwetyana, Tshegofatso Pule, Naledi Phangindawo, Nompumelelo Tshaka, Nomfazi Gabada, Nwabisa Mgwandela, Altecia Kortjie, and Lindelwa Peni, and the many other women who have suffered misogynistic violence. Women’s Month provides us with the opportunity to take hands and speak out against the micro-aggressions and brutal acts of gender-based violence that should not form part of what we define as a truly democratic South Africa. 

Opinion article by Dr Nadine Lake, lecturer and Programme Director of the Gender Studies programme in the Centre for Gender and Africa Studies, University of the Free State


News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept