Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
19 August 2020 | Story Rulanzen Martin | Photo Supplied

 

Art in itself is a journey of self-exploration; with a global pandemic raging, art lovers can now explore this journey virtually. The Johannes Stegmann Gallery at the University of the Free State (UFS) is happy to announce the (second) virtual exhibition of Leeto: a Sam Nhlengethwa Print Retrospective until 4 September 2020. 

 


Sam Nhlengethwa, Tribute to Lemmy 'Special' Mabaso, 2002, Seven colour lithograph, 76 x 106 cm, 
Artwork courtesy of the artist and the Goodman Gallery. 


The exhibition features a collection of Sam Nhlengethwa’s print work to be interrogated, his artistic evolution to be mapped out, and his personal aesthetics to be interpreted, while surveying this renowned artist’s print work from 1978 to 2018.  The underlying theme of the exhibition is jazz, an early influence in Nhlengethwa’s works from the underground jazz community of the townships. His brother was a jazz musician and he started collecting jazz records from the early age of 17.

Leeto is a Setswana/Sesotho word for ‘journey’ and, as the word suggests, the exhibition explores the ongoing artistic footsteps of the artist. The collection was curated by Boitumelo Tlhoaele, a doctoral fellow in the Africa Open Institute for Music, Research, and Innovation at Stellenbosch University.

 Dedicated to Victor Ndlazilwana, 1994, Colour lithograph, 40 x 60 cm

 
Dedicated to Victor Ndlazilwana, 1994, Colour lithograph, 40 x 60 cm
Artwork courtesy of the artist and the Goodman Gallery.




About the artist: 

Nhlengethwa began his career in 1976 during one of South Africa’s most tumultuous socio-political eras. In 1978, he completed a two-year diploma at the Evangelical Lutheran Church Art and Craft Centre, Rorke’s Drift, KwaZulu-Natal, where printmaking was a prominent feature of the centre’s activities. Nhlengethwa’s work spans a variety of mediums, from painting, drawing to collage, and some of his works have been translated into tapestries. One of his big cityscape works was translated into a mosaic. In addition to all the afore-mentioned mediums, Nhlengethwa also produced an impressive and sizeable body of printmaking works. 

He has collaborated with several South African printmaking studios, such as The Artists’ Press, Artist Proof Studio, David Krut Print Workshop, LL Editions Fine Art Lithography Studio, MK and Artist Print Workshop, Mo Editions Printmaking Studio, and Sguzu Printmaker’s Workshop. Since 1994, he has produced 163 prints in collaboration with The Artists’ Press, making it his longest and most productive affiliation. 


 

News Archive

Power shortage: Measures to be implemented immediately
2008-01-31

1. In order to avoid the further implementation of power sharing, electricity companies countrywide are requiring, in addition to measures announced for domestic consumers, that major power consumers save a certain percentage of power.

2. Die UFS is one of the 100 largest clients of Centlec, the local electricity distribution company. During a meeting last Thursday evening with the 100 largest clients, it was indicated that the UFS had to deliver a saving of 10%. The details are as follows:

  • Provision is made to a certain extent for an increase in electricity consumption. The calculation is done as follows: maximum consumption for 2007+6%-10%.
  • This entails a saving during peak times, as well as a saving regarding the total number of units consumed.
  • The saving is calculated on a monthly basis.
  • Saving measures must be implemented immediately (from 7 March). If electricity-saving goals are not attained, power sharing will be resumed from 10 March.

3. The UFS has been controlling its peak demand by means of an energy control system for many years. The geysers of residences and certain central air-conditioning systems were linked to the control system in order to shift energy consumption to non-peak times.

4. In order to attain the goal of 10%, it is necessary to implement further energy control systems and additional measures – which requires time and money. Attention will have to be given, inter alia, to the following:

  • The 1000+ portable air-conditioning units on the campus (huge power guzzlers) must be connected to energy control appliances and systems.
  • All the filament bulbs must be replaced.

7. The UFS will be conducting high-level talks with Centlec later this week with a view to:

  • conveying the unique needs of the UFS in detail;
  • stating the impact of building and refurbishing projects that are currently in the implementation and planning phases;
  • requesting understanding for the fact that the UFS does not have the capacity to immediately deliver the 10% saving.
     

It is evident from discussions thus far that Centlec is sympathetic and wants to help, but also that immediate action and co-operation are expected from the UFS. During the meeting, the UFS must also report back on steps already taken (since 7 March) in this regard.

8. The installation of the emergency power units for the large lecture-hall complexes and a few other critical areas, which has already been approved, is continuing. About R3m is being spent on this. Additional emergency power needs reported to Physical Resources via line managers are currently being investigated with a view to obtaining a cost estimate and subsequently determining priorities in consultation with line managers.

It is recommended that:

a) All line managers, staff members and students be requested to give their full co-operation with regard to saving electricity in every possible way, and that current operational arrangements be amended if possible with a view to promoting power saving. 

Staff, students and other users of campus facilities be requested to see to it that lights and air conditioning (individual units) in unused areas are switched off.

b) The following measures drawn up in co-operation with electrical engineers come into effect immediately:

Arrangements to be made by Physical Resources staff:
(Additional capacity to be able to complete everything within a reasonable period of time will have to be found and funded. This aspect will be taken up with the line managers concerned):

  • The geysers of all office buildings will be switched off at the distribution board. Staff are requested to use a kettle for washing dishes, and are warned not to switch appliances on again themselves.
  • In all office buildings where 12V and 15W downlighters and uplighters remain switched on for decorative purposes and do not serve as primary illumination, the light switches will be disconnected.
  • Lighting in cloakrooms will be checked, and illumination levels will be reduced if possible.
  • All light armatures must be replaced by CFL types.
  • All lights on the grounds will be checked to ensure minimum power consumption.
  • The upper limit of all central cooling systems currently regulated via the energy control system must be set to 24 degrees.

Arrangements to be made by Kovsie Sport:

  • Sport activities requiring sports field illumination must be scheduled after 20:00 in the evening (the lights may not be on between 18:00 and 20:00.)
  • Sports field illumination must be managed so that such lights are not switched on unnecessarily.
     

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept