Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
21 December 2020 | Story Rulanzen Martin | Photo Supplied
The children who took part in the 2020 music programme received a certificate for completing the project.

The yearly Heidedal music outreach progamme presented by the Odeion School of Music (OSM) and the Reach our Community Foundation (ROC) is growing from strength to strength each year. Amid the uncertainties of 2020 three students from the OSM persevered and vowed to continue with the teaching progamme to bring music by the community for the community. 

This annual outreach programme was founded by the Music department at the OSM in 2015 and forms part of the BMus, BA (Music) and Diploma in Music qualification which integrates Music education modules with service learning.

This year’s progamme was established as an alternative to the Marimba Project which has been running for five years. “The aim is to continue with the programme in years to come, equipping and empowering the students to continue with instrumental training,” said Nadia Smith, a BAMus honours student and programme leader. 

Students take charge of 2020 programme 

Nadia Smith, together with third-year BMus students Liana Bester, and Chrismari Grobler, who all voluntarily took part in the progamme for six weeks, presented music lessons to 11 children in Heidedal. “Apart from the music knowledge these children gained they learned about teamwork and collaboration. They gained confidence and self-assurance, and reaped the fruit of their hard work,” said Smith.  

For Smith the six weeks of learning was a wonderful, joyous experience. “As a student music teacher, I am privileged to realise early in my career that to teach music is to teach life. Seeing the children smiling and performing enthusiastically I realised that everyone deserves to be educated in, about, and through music.”

Community concert also to engage and educate 

The teaching culminated in a much-anticipated community concert which took place on Saturday 14 November 2020. The community concert is presented as an ‘informance’, a collaboration between informing and performance. 
“It enables us to engage with the audience by inviting them to sing and move. We also demonstrated to them the process, development and outcomes of the programme,” said Smith. 

“In only 12 lessons the Heidedal students were exposed to different music styles including classical music, jazz and African music, and learned to read and write music notation, and to play the recorder,” said Smith. 

News Archive

New residence planned for UFS South Campus
2015-05-14

The newly-planned residence
Illustration: Typology Architects

The South Campus of the University of the Free State (UFS) in Bloemfontein has seen a great influx of students in recent years. This campus provides academic access to the UFS for deserving matriculants who do not meet the requirements for entry into mainstream degree studies through the University Preparation Programme and Extended Degree Programmes.

In addition, it also offers studies to long-distance learners. The current number of contact students – those who physically attend class at the South Campus – stands at 1 673. At the moment these students stay either on the Bloemfontein Campus or in private accommodation. This is about to change as a new residence is being built for the South Campus.

The newly-planned residence will provide two hundred and fifty beds within two main blocks – each consisting of three floors. Since the campus is located in a predominately industrial area with very few housing facilities in the area, this will fill the urgent need for accommodation.

Each floor of the residence will consist of two wings with forty beds and twenty double rooms. In addition, each floor will have separate laundry/drying and cleaners’ facility shared by both wings on that floor. Each wing will have its own ablution block, study room, communal lounge, and kitchen.

Four separate single-room flats will also be available – each sharing a lounge, kitchen, and bathroom, with a laundry facility separate from that of the main blocks.

The building project is scheduled for completion by the end of June 2016.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept