Latest News Archive
Please select Category, Year, and then Month to display items
20 December 2020
|
Story Thabo Kessah
|
Photo Thabo Kessah
Mbuyiselwa Moloi with student volunteers, Keamogetswe Mooketsi (presenter), Tshumelo Phaladi (producer), and Siphamandla Shabangu (SRC member – Social Justice and Universal Access).
The month of October 2020 marked the first anniversary of the Qwaqwa Campus online student radio, Q-Lit. “It has been a rocky road of sleepless nights, tears, and a lot of challenges. However, we have grown from strength to strength. We have made dreams of ordinary students possible. We have influenced change and inspired students to tap into their talents and potential,” said an elated station manager, Mbuyiselwa Moloi.
The station came in handy during the worst lockdown period of the COVID-19 pandemic when it bridged the communication gap between students and the university to integrate teaching and learning into the programming to ensure that no student was left behind. “With all of the regulations and online learning, Q-Lit had to be reinvented. While it was not an easy journey, we have grown more than ever before. Our August 2020 report shows that we have pulled in more than 1 600 listeners, even amid the learning, unlearning, and relearning processes. It was during this month that we also ran a series highlighting strategic offices led by women on campus as part of our Women’s Month celebration,” Mbuyiselwa revealed.
Looking to the future, the station hopes to obtain a full broadcasting licence from the regulatory body, the Independent Communication Authority of South Africa (ICASA), soon.
How to interpret Centlec’s load shedding
2008-01-31
Everyone in South Africa is affected by power failures (load shedding). Centlec took certain measures to manage the situation. These measures are explained:
Time slots
See the following table for an indication of times when load shedding might be applied to specific areas: http://www.centlec.co.za/power_shed/PDF/time_slots.pdf
Groups
The city was divided into six groups. This document clearly indicates which area in the city resorts under which group: http://www.centlec.co.za/power_shed/PDF/groups.pdf
According to the document, the university resorts under group 4. In the table with time slots it is the grey area.
Stages
Eskom developed three stages for load shedding. (See stage table at the bottom of the page http://www.centlec.co.za/power_shed/PDF/time_slots.pdf)
- Stage 1: Less load shedding is applied in stage 1. E.g. the UFS resorts in group 4 and on a Monday, according to stage 1, the power will not be switched off during 12:00 and 14:30 (this time slot is not highlighted in orange).
- Stage 2: More load shedding is applied in stage 2. Load shedding will be applied during stage 2 between 12:00 and 14:30 on a Monday at the UFS.
- Stage 3: All time slots are highlighted in orange, which indicates that power will be switched off for the whole duration of stage 3.
Example
Today, Tuesday, load shedding was scheduled to take place from 10:00 to 12:00 at the UFS. Currently, according to Centlec’s web site, stage 1 is active. This time slot is not marked in stage 1, therefore load shedding is not applied. Centlec gives also additional information; “No load shedding in progress.”
Keep in mind that if an area is at risk it does not automatically imply that the power will be switched off. It all depends on the request from Eskom at that particular moment whether the actual shedding is required.