Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
21 December 2020 | Story André Damons | Photo Supplied
The KAT Walk mini (Omni Directional Treadmill) used to reduce and eliminate cybersickness.

An officer at the School of Nursing Simulation Laboratory of the University of the Free State (UFS) is aiming to cure or minimise cybersickness in nursing students with a popular virtual reality gaming tool.

Bennie Botha, who is acting as head of the Information, Communication and Simulation Technology at the School of Nursing Simulation Laboratory, developed a virtual environment in which nursing students use immersive virtual reality to perform a simulation scenario. This is part of his master’s degree in Computer Science and Informatics under the supervision of Dr Lizette de Wet and co-supervisor Prof Yvonne Botma.

Botha received his master’s degree with distinction during the UFS virtual graduation in October.

Cybersickness

Botha had found that some people experience cybersickness (almost like motion sickness), which is a significant issue and difficult to address. This he would now try to address with a virtual reality gaming tool – the KAT Walk mini.

According to Botha this technology has never been attempted for health-care education and is mostly used in military and pilot training and is very popular as a gaming platform for hardcore virtual reality gamers.

“To test and provide a possible solution I am going to incorporate the KAT Walk mini (Omni Directional Treadmill – almost like the Ready Player One concept) into which students are strapped and they can physically walk and turn around without the need for large open spaces.

“With this I will try and determine whether it decreases or even eliminates cybersickness due to sensory mismatch while using immersive virtual reality. I wanted to provide possible evidence of what causes cybersickness and want to enable virtual reality as an educational tool, not just for gaming. I think immersive virtual reality has a bright future if the kinks (of which the biggest is cybersickness) can be minimised,” says Botha.

Getting funding

He successfully applied for funding in 2020 and received R150 000.

“I must say I was surprised when I got the approval letter. I thought that due to the economic status it would not go through, but I was really glad when I got the approval as this is my dream and I love working with virtual reality for health care. The grant has made my dream come true, especially considering that this sounds more like something from science fiction,” says Botha.

The project started in November 2017 when Botha first conceptualised the idea and took it to Dr De Wet. He then started it as a masters’ project in 2018 and completed it at the end of 2019.

An equal opportunity for students

Botha says immersive virtual reality gives students more time and a more accessible platform where they can practise their skills as it is easy to use and easy to set up compared to other modalities of simulation. But the biggest task is developing a usable virtual environment that gives students more time to practise and increase their theory and practical integration which is key to providing highly skilled health-care professionals.

“By seeking and possibly implementing the new research, I aim to provide students an equal opportunity to partake in immersive virtual reality simulation as it currently excludes people who are prone to high levels of cybersickness. This means they cannot benefit from the same opportunities as other students do.

“I believe it can help all nursing students in SA and Africa as it is much more cost-effective than high-technology manikins and is easier to set up and access with much less manual input required to make it work (apart from the initial development.).”

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept