Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
03 February 2020 | Story Cobus van Jaarsveld | Photo Charl Devenish
Traffic Circle on the UFS Bloemfontein Campus
The Department of Protection Services shares how to #BSafe at traffic circles.

For the majority of drivers, one of the most confusing driving laws is the correct use of a traffic circle, especially in Bloemfontein with the large number of smaller traffic circles constructed over the past few years; also across the University of the Free State (UFS) Bloemfontein Campus.

“In fact, many motorists do not know that there is a difference between a larger traffic circle and a mini traffic circle, other than their size. Can you really be frustrated if someone cuts you off at a traffic circle if you don't know the rules? Arrive Alive has shed some light on the issue,” said Cobus van Jaarsveld, Assistant Director: Threat Detection, Investigations and Liaison in the UFS Department of Protection Services.

What is the difference between the two circles?

A traffic circle is classified as large when it has a minimum diameter of about 16 metres and a 1,5 to 2 metre flattened kerb, which allows heavy vehicles to drive onto a small section of the circle. A mini traffic circle is normally not more than seven to ten metres in diameter and the entire circle is mountable for heavy vehicles.

Are there different rules for each?

Yes – the rule of thumb is that mini traffic circles, which are usually found in residential areas, have the same rules as a four-way stop – first come first served. For larger traffic circles, which are usually found at busy crossings to assist with the traffic flow, you must give way to the right.

Rules to remember at a large traffic circle

As you arrive at a large traffic circle, traffic coming from your right has right of way, regardless of how many cars there are. Wait until there is a gap in the traffic and then ease slowly into the circle. Watch out for other traffic in the circle and be aware that they may not be using their indicators.

Use your indicators

Signal when you are going to turn – switch your indicator on immediately after passing the exit prior to the one you intend taking. If you are taking the first exit, i.e. you're turning left, then flick on your left indicator and keep in the outside/left-hand lane. Keeping in the outside/left-hand lane also works well if you're continuing straight ahead, as your exit is very close. After you've passed the left-turn exit and yours is next, signal left and you're free. If you're turning right or performing a U-turn, keep in the inside/right-hand lane. Only signal left and change into the left-hand lane once you've passed the other exits and only yours is ahead.

Rules to remember at a mini traffic circle

The first vehicle to cross the line has the right of way, so it really works on the same principle as a four-way stop or yield sign. Proceed in a clockwise direction around the circle, without driving on it.

News Archive

Getting out of the dark
2015-06-10

 

ESKOM is making daily announcements on the status of the power grid.

Anton Calitz, Electrical Engineer at University Estates, is in continuous contact with Eskom and Centlec in an effort to stay abreast of load shedding.

According to Anton, Eskom has recently - the week of 20 April - been focusing on the evening peak, and has announced STAGE 1 load shedding from 17:00-22:00; thus, the Bloemfontein Campus should be able to continue business as usual during the day, except for Thursdays from 18:00 and, possibly, Fridays from 17:00.

Where can I get more information about load shedding stages?

Apart from Eskom’s webpage, staff can also visit GRID WATCH. Click on "Search", then under "Schedules". Look for "Mangaung Local Municipality", and select "GROUP 4". Save this location. “This can even be loaded onto your mobile device.”

“The time slots can be seen for a couple of days in advance, to allow us to plan around the possibility of load shedding in our daily lives,” said Anton.

Please note: ESKOM can change the STAGE level at any time. Therefore, keep an eye on GRID WATCH and News24.

View the typical seven-day planner for the Bloemfontein Campus (Group 4), which indicates the STAGE 2 and 3 possibilities. Take note that, on some days, the STAGE 2 and 3 time slots are the same.

More load shedding tips: Your IT needs

The UFS Data Centre (Computer Room) is fully serviced by a generator facility, and can function without external power supply for a few days.

The generator servicing the UFS data centre does NOT provide power to the outlying facilities. This implies that all digital equipment at gates, booms, and access points will be shut down until the power is restored to these facilities. “We are now, in collaboration with Nico Janse van Rensburg, in a process to install UPS facilities at these points, which will ensure two to three hours of power supply at these points, even during load shedding,” said Dr Vic Coetzee, Senior Director: ICT Services.

No Wi-Fi will be available, as it is dependent on the power supply to the buildings where it is installed.

All servers are contained in the data centre, and will be kept running by our generators.

How to manage load shedding and your IT needs:

1. Get into the habit of saving your work regularly on computer so that you don’t lose your work/files during load shedding.
2. Back up important data. Keep to a schedule of regular back-up.  Make sure your computer back-ups are safe and recoverable.
3. Keep all electronic devices charged and ready to run on battery power. Keep your cellphone charged: some old-style Telkom landlines will still operate during power outages, but others won't.
4. Remember, when power supply is restored, it sometimes happens that a power surge is sent through the network, which will damage your computer.  Fortunately, laptop computers will not suffer this fate as their power is provided through an external power pack. Often, this power pack will be damaged, but not the laptop itself.
5. It makes good sense to reboot your computer daily, not only in terms of power shedding, but also in terms of updating the drivers, software, etc.
6. Switch off all computers and other electrical equipment at the wall plug overnight and on weekends.
7. Should your IT equipment not switch on after a power outage, log a call with the ICT Services. You can also call them at x2000.

More information, guidelines and contact numbers

 

 