Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
30 July 2020 | Story Leonie Bolleurs | Photo Supplied
Henning Neethling, the newly appointed CFO of Sky News Australia.

After a number of finance jobs in both big and small companies, UFS alumnus Henning Neethling was ready for a new challenge when the opportunity to join one of Australia’s most influential companies came knocking on his door. 

Neethling, who completed his bachelor’s and honours degrees in Accounting at the UFS between 2000 and 2004, together with a Certificate in the Theory of Accounting (CTA), was strongly attracted to the position at Sky News Australia when he was presented the opportunity.  

“The Department of Economic and Management Sciences, especially the amazing lecturers I had during my time there, as well as my fellow students, played a pivotal role in my education and prepared me for this job. As a kid you take things for granted, but the more my career progresses, the more I realise how much effort, investment, and influence these lecturers had on me as a student.”

Neethling also believes that the university inadvertently provides its graduates with an insight into real life; what it would be like to take responsibility for your career, drive your own results through hard work and determination, and to really get tested on how much you wanted something.

Strong relationships

Working at Sky News Australia, especially in the role of Chief Financial Officer (CFO), requires some distinguishing qualities. Neethling feels it is important to always build strong relationships at all levels – not only with staff reporting to you, but also with peers, stakeholders, related parties, suppliers, superiors, etc. 

“For me, relationships lay the foundation for getting things done – more often than not – better and faster due to the collaboration that flows from it,” he says. 

And the UFS also contributed to this skill. Neethling says he learned a great deal during his time at the university, “not only in the classroom, but also on the rugby field playing for Shimlas”. 

“It combined to make me a more rounded person. It is essential, specifically when you are in a leadership position, to have been part of a team and to really understand that dynamic. In the workplace, it is very clear that the more rounded individuals are often people who played team sports or were part of a team. This is where you learn that your actions impact others around you and that you should be ready to be held accountable for it.”

Another quality required of him as CFO is to have a flexible mindset. “Being able to adapt to an ever-changing landscape is key. The only constant is change, and no truer words can be spoken about the media landscape in this day and age. So, to survive – but more importantly – to thrive, you need to adjust to the circumstances and do it swiftly,” he says.

Dealing with COVID-19

If there ever was a time to adjust to circumstances, we can all agree that it is now, with the presence of the COVID-19 pandemic. He says to date, it has been one of the biggest challenges he had to deal with.

“In my first month in this role as CFO of Sky News, COVID-19 really took off on a global scale. It was a combination of numerous reforecast submissions, business interruptions, revaluation of risks, improvement of processes, and uncertainty. But it all came back to strong relationships with the team, the business, and all other stakeholders getting you through something like this.” 

He believes the UFS is on the right track with its mental-health awareness campaigns. “I think the most important lesson an institution such as the university can teach its students and graduates in dealing with the challenges brought by COVID-19, is how we treat people with mental-health issues and also how we manage ourselves when it comes to that.”

And how do one take care of yourself if you are in an ever-changing, fast-paced job as CFO? By starting the day with that first cup of coffee. “I cannot function without that coffee, trust me.” And by making time for loved ones – his six-month-old baby, Maia, and his wife, Madi.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept