Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
18 March 2020 | Story Leonie Bolleurs | Photo Supplied
Solar car Team
Excited about a first for the UFS, Team UFS is entering the 2020 Sasol Solar Challenge. From the left, front, are: Fouché Blignaut, Mechatronic Engineering; Nathan Bernstein, Agricultural Engineering; Lucas Erasmus, Physics; middle: Barend Crous, Manufacturing and Instrumentation; Hendrik van Heerden, Physics (team leader); Antonie Fourie, Physics; Prof Danie Vermeulen, Dean of the Faculty of Natural and Agricultural Sciences (team director); Prof Koos Terblans, Head of the Department of Physics; Theo Gropp, Mechanical Engineering; back: Louis Lagrange, Head of the Department of Engineering; and Mark Jacson, Electronics.

An interdepartmental team from the University of the Free State (UFS) has announced that it will enter and participate in the 2020 Sasol Solar Challenge, scheduled to take place from 11 to 19 September this year. 

For the challenge, Team UFS will build a self-propelled manned vehicle that uses solar power systems to travel from point A to point B. The 14-member team of the UFS will travel on public roads from Pretoria to Cape Town via a predefined route over eight days. They will compete against more than 15 other teams, both local and international. The team that finishes with the greatest distance covered within the allotted time, will win the race. Teams will race every day between 07:30 and 17:00.

The four drivers to operate the vehicles will be selected from participating UFS departments in the coming months.

First solar car for the UFS
Dr Hendrik van Heerden from the Department of Physics has been planning the solar car project – Lengau (meaning Cheetah in Sesotho) – over the past year. He will start assembling the car in the next month together with colleagues and students from both the Departments of Physics and Engineering Sciences (EnSci).

Not only is this a dream come true, but it is also an opportunity for the UFS to show that they can do this. “We do not need the backing of a large and long-established engineering department to build a car like this, a young and vibrant team can do just as much!”, says Dr Van Heerden, who plans to complete the car within a few months, ready to be calibrated and tested later in June.

Capacity in green and sustainable engineering
“The ability of Team UFS to participate is possible due to recent research developments on photovoltaic technologies (solar cells) in the Department of Physics, a well-established leader in the field of surface and material sciences. The university also has established capacity in the fields of photoluminescence and nanomaterials (nanomaterials in energy storage). Additionally, with the establishment of EnSci, the university has expanded into this field, which will bring building capacity in the area of green and sustainable engineering to the project,” says Dr Van Heerden.

Promoting development into green technologies and 4IR
According to Dr Van Heerden, it is clear that the university wishes to become a strong role player in the development and utilisation of green energy, as can be seen in the implementation of relevant technologies on its various campuses. “Thus, for the UFS to be recognised in this research area, it is important to participate in related ‘green’ events where staff and students can build their capacity of practical knowledge by constructing participation equipment such as the solar car.”

He believes that this project has the potential to become a strong base for student training and capacity building in all technological fields, which can promote base development to 4IR.

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept