Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
02 November 2020 | Story Ruan Bruwer | Photo Varsity Sports
Lefébre Rademan, the country’s top student netball player in 2019, has been snatched up by English netball club London Pulse to play in England in 2021.

 

Attempting to become an even better netballer, former Kovsies netball captain Lefébre Rademan decided to jet off to England to play in their league.

Rademan was contracted by London Pulse to compete in the European Superleague in 2021. She will be the fourth Kovsie after Maryka Holtzhausen (2015 and 2018-2019), Karla Pretorius (2016), and Khanyisa Chawane (2020) to play in the league.

Rademan said it was an easy decision, even though it will be far and a long time away from home. The league runs from February to July, with a pre-season in December. She will continue with her master’s degree at the University of the Free State next year.

“I am not going to play netball forever and such an opportunity doesn’t come often. Having competed against England, New Zealand, and Jamaica earlier in the year, I realised they play at a much higher level and if I want to improve and become the best, I would also need to move to a next level.”

“As a goal attack, having Protea teammate Sigi Burger (goal shooter) at the same club, will be an advantage for both of us and for the Proteas as a combination.”

Rademan has had a great past two years, making her Protea debut (12 tests in total) and receiving a number of accolades, such as the Varsity Netball Player of the Tournament in 2019.

In the Telkom Netball League in October, captaining the Free State Crinums, she was named Shooter of the Tournament. She was Player of the Match twice. Her goal average of 88,1% was the highest in the competition.

“Last year was such a good year for me personally, but that remains in the past. You can’t become complacent. I want to keep working hard and become a much better player,” Rademan said.

 

News Archive

UFS has a contingency plan for load shedding
2008-02-13


The University of the Free State (UFS) has put in place a contingency plan to ensure that there is minimal disruption to the normal academic operations of its Main Campus in Bloemfontein whenever load shedding occurs.

The plan includes alternative arrangements for certain lectures that fall within the load-shedding schedule provided by Centlec, the emergency power generation for certain lecture halls and buildings, as well as the functioning of the UFS Sasol Library. This is in addition to emergency power equipment that has already been ordered for the larger lecture-hall complexes.

Fortunately, the Qwaqwa Campus has adequate emergency power generation capacity. The situation on the Vista Campus in Bloemfontein is being monitored, but the same guidelines will apply as on the Main Campus.

On the Main Campus in Bloemfontein the following alternative arrangements regarding the timetable for evening classes will come into effect when load shedding occurs:

  • An alternative module and venue timetable has been compiled so that classes that cannot take place on weekdays as a result of load shedding can be accommodated on Fridays and Saturdays.
  • Classes that are presented in the timeslot 18:10 to 21:00 on Thursdays are alternatively accommodated in the same venues at the same times on a Friday.
  • Classes that take place in the timeslot 20:10 to 22:00 on Wednesdays are alternatively accommodated in the timeslot 08:10 to 12:00 on Saturdays, in a few cases in different venues from those scheduled initially.
  • After consultation with students, lecturers will decide whether the alternative timetable will apply when load shedding does indeed occur or whether the alternative timetable will be a permanent arrangement.

Some other steps that have been taken regarding the functioning of lecture halls include:

  • The design and installation of emergency power equipment in all the large lecture-hall complexes within the next few months. This includes the Examination Centre, Flippie Groenewoud Building, the Stabilis and Genmin lecture halls.
  • The ordering of a larger generator for the Agriculture Building to simultaneously provide essential research equipment such as refrigerators, ovens and glasshouses with emergency power.
  • An investigation into the optimal utilisation of present emergency power installations.
    The purchasing of loose standing equipment such as battery lights, uninterruptible power supplies, loose-standing generators, etc.

The UFS Sasol Library will continue as normal as far as possible though there may be some minor changes as a result of load shedding. The library has an emergency generator that will be used in the event of load shedding to allow students and other users to exit the library. If load shedding occurs during daylight hours, the library will remain open with limited services. If the load shedding occurs after 6 pm (18:00), all users will be allowed to exit and the library will remain closed until the next day.

A comprehensive investigation into the university’s preparedness for and management of long term power interruptions is also receiving attention.

More information on the contingency plan for load shedding can be obtained from the UFS website at www.ufs.ac.za/loadshedding.

Media Release
Issued by: Lacea Loader
Assistant Director: Media Liaison
Tel: 051 401 2584
Cell: 083 645 2454
E-mail: loaderl.stg@ufs.ac.za
13 February 2008


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept