Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
28 October 2020 | Story Nitha Ramnath


Lunchtime learning webinar series on Interdisciplinarity in Action

Mastering a musical instrument, such as the piano, requires the simultaneous integration of a multimodal, sensory system and motor information with multimodal, sensory feedback mechanisms that continuously monitor the performance. Performing intricate movements requires complex, sensory-motor programming of finger and hand movements, which can result in a reorganisation of the brain regarding functional and structural changes of existing and the establishment of new connections. Neuronal networks involved in music processing are adaptable and fast-changing. When motor skills are simplified to the most important action, it consists of nerve impulses sent to the muscles.

In this webinar, Dr Frelét de Villiers discusses the interdisciplinarity between the two fields of music and neuroscience. Promising preliminary data has been reported for applications of transcranial direct stimulation (tDCS) of the motor cortex, ranging from stroke rehabilitation to cognitive enhancement. These findings raise the alternative possibility that the fine motor control of pianists may be improved by stimulating the contralateral motor cortex. 

In our interdisciplinary study, we want to use the Halo Sport neurostimulation system (a physical training aid). This is a tDCS device, designed to optimise the efficiency of training sessions and accelerate gains in any physical skill, especially when the neurostimulation is complemented by focused repetitive training. The main questions of the study are the following: do pianists experience a noticeable difference in mastering repertoire with and without the HALO Sport device, and can functional and structural changes in the brain be observed after using the Halo Sport consistently over six months? Data collection will consist of EEG tests, fMRI scans, interviews, and analysis of performances by an expert panel. The value of the research is the possibility that practising with the HALO may improve the performance of the students and that changes in the brain may be observed. Interdisciplinary engagement is essential to conduct this research. If it is possible to establish that there are functional and structural changes in the brain and improvement in the performance of the pianists, the research can be extended to other disciplines with hopefully the same positive results.

This webinar is part of a series of three webinars on Interdisciplinarity that will be presented from November to December 2020 via Microsoft Teams for a duration of 45 minutes each. The webinar topics in the series will explore the intersection between Neuroscience and Music, between Science and Entrepreneurship, and between Science and Visual Arts.  

Date: Thursday 5 November 2020
Topic: The intersection between neuroscience and music 
Time: 13:00-13:45
RSVP: Alicia Pienaar, pienaaran1@ufs.ac.za by 4 November 2020 at 12:00
Platform: Microsoft Teams

Introduction and welcome
Prof Corli Witthuhn – Vice-Rector: Research at the University of the Free State 

Presenter
Dr Frelét de Villiers

Dr de Villiers is a Senior Lecturer at the Odeion School of Music. She is head of the Methodology modules, short learning programmes, lectures in piano, music pedagogy, arts management, and is a supervisor for postgraduate students. She is a member of the Faculty of the Humanities Research Committee, Interdisciplinary Centre for Digital Futures, Scientific Committee (Arts), and the Ethics Committee (the Humanities). Her field of expertise is piano technique, with particular emphasis on the influence of the brain and the whole-brain approach to music. Her passion is the use of technology in the music teaching situation – she developed a note-learning app, PianoBoost (available on Google Play).

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept