Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
17 August 2021 | Story Dikgapane Makhetha | Photo Supplied
Bishop Billyboy Ramahlele (Director: Community Engagement), Napo Masheane (lead actress), and Troy Myeni (Director)

A short fiction film that was shot in Botshabelo and on the Bloemfontein Campus of the UFS, has once again shown the endless possibilities of engaged scholarship in the creative arts.

For this film project, engaged scholarship meant working with graduates / current students from the UFS on projects with a relevant and impactful theme for the broader community. The project was aimed at giving current or past students the opportunity to gain experience or share experience and to transfer skills in the area of filmmaking. 

The short fiction film, Leshano (The Lie), was directed by Mpendulo ‘Troy’ Myeni, a graduate of the UFS Film Programme, who also won an award at the Pan African Film Festival in the US for another of his short films.  Troy was also one of the three co-producers, along with Anton Fisher (a former employee of the UFS), who wrote the script, and Moeketsi Mphunye, a young filmmaker from Botshabelo.
Another notable UFS graduate who was central to the production, is Mbuyiselo Nqodi. He graduated with a BA in Drama and Theatre Arts and has since gone on to make a huge contribution to the performing arts in the Free State and South Africa. Mbuyiselo was the first assistant director of Leshano (The Lie) and had the unenviable job of keeping everything moving on set.  Other members of the production registered at the UFS, but never completed their studies. 

Bishop Billyboy Ramahlele, Director of Community Engagement at the UFS, said he was proud that the UFS could be part of this filmmaking project by making offices available as locations for the film and through the participation of distinguished graduates in key positions of the production.

“The UFS has much to offer young people as students, but also as graduates who seek to advance in their chosen careers. Through community engagement, these young people, whether students or graduates, can be inspired by working with professionals in various fields and gaining hands-on experience. They can then plough back into the community and the UFS.”

“This is the virtuous cycle of community engagement at a university. Students gain knowledge, then they gain inspiration and experience, and plough back into the UFS and broader community, instilling hope for future generations,” Bishop Ramahlele said. 

He added that the UFS would be mentioned in the credits of the film and in publicity and marketing of the film, profiling its reputation as a centre of creative excellence.

Leshano (The Lie) was filmed in Sesotho, with English subtitles, and deals with the important issue of corruption. The lead role is played by the acclaimed Napo Masheane who grew up in Qwaqwa, supported by well-known Free State actors Maria de Koker, Seipati Mpotoane, Ntsiki Ndzume, Vincent Tsoametsi, Pesa Pheko, and Shayne Nketsi. 

Several young, aspiring filmmakers from across the Free State were recruited for the project. It was their first time on the set of a film production, whether as make-up artists, behind the scenes photographers, unit production managers, wardrobe assistants, or location scouts. 

With a strong line-up of women in the lead roles, the film will be released later in August during Women’s Month. 

News Archive

Getting out of the dark
2015-04-28

Photo: Leonie Bolleurs

Since 2008, the University of the Free State has been busy with the planning and implementation of projects to reduce the impact of load shedding. To date,  the cost of these projects has run to R6 million. They have been done primarily to ensure that the academic programme does not suffer damage as a result of the increasing interruptions in the power supply that are continuing this year.

The university’s greatest concern has been the provision of emergency power to the lecture halls and laboratories.

Thus far, 35 generators are servicing 55 buildings on the three campuses of the UFS. This includes 26 generators on the Bloemfontein Campus, eight on the Qwaqwa Campus in the Eastern Free State, and one generator on the South Campus in Bloemfontein. The generators are already in service, and are maintained in working order.

Since 2010, the university has also ensured that all newly-built academic buildings are equipped with emergency power supplies.

On the South Campus in Bloemfontein, the new lecture-hall building and the computer laboratory are equipped with emergency power, while the installation of emergency generators in other buildings is under way. The majority of the buildings on the Qwaqwa Campus in the Eastern Free State are equipped with emergency power supplies.

In the meantime, the UFS management has approved a further R11 million for the installation of additional generators on the three campuses. A further R1.5 million has also been approved for the purchase of two mobile generators.

To extend the work already done, the main task will be the installation of more generators on the Bloemfontein Campus to ensure that lecture halls with emergency power will be available for the centrally-arranged timetables, and to ensure that more of the critical laboratories will be provided with emergency power.

There are still  some important buildings and halls on the Bloemfontein Campus that must be supplied with emergency power. However, it is a costly process and must be brought into operation gradually. The further implementation of emergency power depends on the delivery of equipment. The university is also investigating alternative solutions for power provisioning, including solar power.

Generators with spare capacity are optimally deployed to satisfy the lower needs of the campus, including the Odeion, the ANNEX at Microbiology, the Stabilis ANNEX, the Agriculture Building, the UV-Sasol library, and the Francois Retief Building.

In addition, the UFS  is busy on all campuses, coupling area lighting, including

street lights and pedestrian walkways, to existing generators. Procedures for the operation of mechanical equipment, such as entrance gates, lifts, and so on, are currently being dealt with on all campuses. Continuous power sources for certain ICT equipment will be installed on all campuses to protect it against power surges.

Staff and students can also equip themselves with the necessary knowledge to manage load shedding in their specific areas of work and study. It is always helpful to know who to contact. The following list with guidelines and contact numbers has been compiled to assist you:

1. In an emergency, call Protection Services. This line will continue to operate, regardless of whether the power is on or off.
2. Avoid using lifts just before planned load shedding. Some lifts have emergency power packs which will bring the lift to the nearest floor and open the doors. If you still get stuck in a lift during a power outage, use your cellphone to call Protection Services. While you're waiting, stay calm and be patient.
3. If the access control systems in your building stop working after load shedding, contact Protection Services.
4. The students and staff members who are most at risk during load shedding are those in wheelchairs or with other mobility limitations. As far as possible, plan ahead to avoid being stuck on a floor or in a room that is difficult to access when load shedding is imminent. Please contact Protection Services if you need assistance.
5. During a fire, alarms WILL go off. Alarms are not power driven, but battery driven. For assistance, contact Protection Services.
6. The main UFS Switchboard (Bloemfontein Campus +27(0)51 401 9111 and Qwaqwa Campus +27(0)58 718 5000) will continue to operate during load shedding.

Contact details of Protection Services:

  • Bloemfontein Campus: +27(0)51 401 2634/2911
  • Qwaqwa Campus: +27(0)58 508 5460/5175
  • South Campus: +27(0)51 5051217

Communication and Brand Management will make information available on the UFS web, Facebook page, Twitter, Blackboard and the intranet. Get the load shedding schedule from Eskom’s webpage (http://loadshedding.eskom.co.za/). The Bloemfontein Campus falls in group 4 and the South Campus falls in group 2 in Centlec’s load shedding schedule.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept