Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
12 August 2021 | Story Leonie Bolleurs | Photo Supplied
Tinus Viljoen (second from the left) is responsible for waste management at the university. Here he is pictured at the new chemical waste facility on the western side of the Bloemfontein Campus. With him, on his left, is Nico Janse van Rensburg, Senior Director, University Estates; Prof Danie Vermeulen, Dean of the Faculty of Natural and Agricultural Sciences; and on the far right is Benedict Mochesela, officer at University Estates.

A new chemical waste facility on the western side of the Bloemfontein Campus started functioning in July 2021 and will enhance the safe storage of hazardous materials on campus.

Since the safety of its staff and students are a key priority for the university, as stipulated in its strategic plan, a facility such as this plays an essential role in reducing any health risks and even the possibility of an explosion.

Tinus Viljoen, a Lecturer in the Department of Genetics, concurs that this facility makes the university a safer place because there are less toxic and flammable waste lying around in the labs. 

Besides his role as lecturer, he is responsible for waste management, including the collection of hazardous waste internally, classifying it, and arranging for it to be collected by accredited waste companies. 

A safer space

Waste previously stored in the Genetics Building is now kept at the new facility. Viljoen is of the opinion that this new space is safer because fewer students and staff have access to the western campus. “The chemical waste tends to smell, and on this part of the campus it is out of the way,” he says.

He also says that it helps to have a central place to store the waste, because of logistical reasons. “It makes the overall waste management easier.”

It is mainly inorganic and organic liquid/solid waste, contaminated glass, contaminated solids (e.g., filter paper and gloves), acid waste, and expired chemicals that are stored at the facility. 

This facility makes the university a safer place because there are less toxic and flammable waste lying around in the labs. – Tinus Viljoen

Adhering to legislation

He explains that he is notified by departments in the Faculty of Natural and Agricultural Sciences when they have waste to collect and that he then collects it on Fridays.

Viljoen continues: “The chemical waste is then classified according to the various waste streams and stored in large 210 l drums. When the drums are full, I contact an accredited hazardous waste company to remove, transport, and dispose of the various waste according to strict legislation, constituting the National Environmental Management Act (Act 107 of 1998), the National Environmental Management: Waste Act, 2008 (Act 59 of 2008), the Hazardous Substances Act (Act 5 of 1973), and the National Road Traffic Act, 93 of 1996 (NRTA).”

“The majority of the waste is transported to a hazardous landfill in Gauteng and the rest are incinerated,” he concludes. 

News Archive

Major infrastructure development planned for three campuses
2014-01-06

 

DHET Sound Studio, African Languages and Humanities projects.
More students will be accommodated on our campuses, with two new residences being built on the Qwaqwa and Bloemfontein Campuses respectively. The residences are part of a grant received by the Department of Higher Education and Training (DHET).

The new residences will accommodate 250 students each and the planned completion date is end of 2014.

Other major projects planned for the three campuses are a Student Life Centre on the Qwaqwa Campus, new lecture halls for the South Campus and a new sound studio on the Bloemfontein Campus. The sound studio will be erected where the old squash courts used to be.

The Department of Physical Planning stated the aim is to create a facility that can house a recording studio that will function as a multi-purpose centre where students can get practical experience in sound and visual recording. Albie Louw, Chief Officer: Property Management in the Department of Physical Planning, says the studio will have a screening room, a multi-camera recording studio, editing room, video- and audio-control room and lecture-recording studios.

The projects have different completion dates, but all fall within the 2013/2014 and 2014/2015 financial years.

On the Qwaqwa Campus, the existing amphitheatre in front of the library will get a roof, so that it can be used more effectively and be more accessible. It will create a new active open space that can be utilised by students for informal study, a social space and for formal functions or promotions.

Other facilities to be upgraded include the electrical infrastructure on the Qwaqwa Campus. Disability access on the campus will also be improved.

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept