Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
12 August 2021 | Story Leonie Bolleurs | Photo Supplied
Tinus Viljoen (second from the left) is responsible for waste management at the university. Here he is pictured at the new chemical waste facility on the western side of the Bloemfontein Campus. With him, on his left, is Nico Janse van Rensburg, Senior Director, University Estates; Prof Danie Vermeulen, Dean of the Faculty of Natural and Agricultural Sciences; and on the far right is Benedict Mochesela, officer at University Estates.

A new chemical waste facility on the western side of the Bloemfontein Campus started functioning in July 2021 and will enhance the safe storage of hazardous materials on campus.

Since the safety of its staff and students are a key priority for the university, as stipulated in its strategic plan, a facility such as this plays an essential role in reducing any health risks and even the possibility of an explosion.

Tinus Viljoen, a Lecturer in the Department of Genetics, concurs that this facility makes the university a safer place because there are less toxic and flammable waste lying around in the labs. 

Besides his role as lecturer, he is responsible for waste management, including the collection of hazardous waste internally, classifying it, and arranging for it to be collected by accredited waste companies. 

A safer space

Waste previously stored in the Genetics Building is now kept at the new facility. Viljoen is of the opinion that this new space is safer because fewer students and staff have access to the western campus. “The chemical waste tends to smell, and on this part of the campus it is out of the way,” he says.

He also says that it helps to have a central place to store the waste, because of logistical reasons. “It makes the overall waste management easier.”

It is mainly inorganic and organic liquid/solid waste, contaminated glass, contaminated solids (e.g., filter paper and gloves), acid waste, and expired chemicals that are stored at the facility. 

This facility makes the university a safer place because there are less toxic and flammable waste lying around in the labs. – Tinus Viljoen

Adhering to legislation

He explains that he is notified by departments in the Faculty of Natural and Agricultural Sciences when they have waste to collect and that he then collects it on Fridays.

Viljoen continues: “The chemical waste is then classified according to the various waste streams and stored in large 210 l drums. When the drums are full, I contact an accredited hazardous waste company to remove, transport, and dispose of the various waste according to strict legislation, constituting the National Environmental Management Act (Act 107 of 1998), the National Environmental Management: Waste Act, 2008 (Act 59 of 2008), the Hazardous Substances Act (Act 5 of 1973), and the National Road Traffic Act, 93 of 1996 (NRTA).”

“The majority of the waste is transported to a hazardous landfill in Gauteng and the rest are incinerated,” he concludes. 

News Archive

Computer laboratory receives generous donation from the Dell Foundation
2008-05-12

The University of the Free State (UFS) recently received 200 computers to the value of R2 million from the Dell Foundation.

The computers will be used in the new computer laboratory, which is being built between the UFS Sasol Library and the Genmin Lectorium on the Main Campus in Bloemfontein.

The building will make ample provision for students who have to make use of a computer for study purposes.

Altogether 815 computers will be at students’ disposal in the new laboratory. On the ground level four rooms will be furnished with computers. Students will be able to have discussions in two of these rooms, while they can work in silence in the other two rooms.

Provision is also made for 18 group rooms, which will be furnished with a computer and big screen. These rooms can occupy seven persons and will be made available by means of a booking.

Lecture halls will be built on the second level, together with the group rooms. The largest of these will have 184 seats and can also be used as an examination hall.

Another hall with 170 seats and three with 40 seats will be available. Two lecture halls will be furnished with laptops on movable desks to enable students to work in groups.

Security cameras will be installed all over the building and strict security measures will be enforced.

The laboratory, with a total project cost of about R28 million, will be in use next year.

Media Release
Issued by: Lacea Loader
Assistant Director: Media Liaison
Tel: 051 401 2584
Cell: 083 645 2454
E-mail: loaderl.stg@ufs.ac.za  
12 May 2008

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept