Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
14 December 2021 | Story Leonie Bolleurs | Photo Supplied
Ofhani Mavhungu was recently awarded the Professor Rob Gous Scholarship by the Animal Feed Manufacturers Association (AFMA) of South Africa.

From a very early age, Ofhani Mavhungu knew he wanted to be involved in agriculture one day. Fast forward a few decades and you find Ofhani enrolled for the MScAgric Animal Science degree at the University of the Free State (UFS).

As a goal-orientated person who is open to new ventures, he reckons this degree will broaden his knowledge and understanding of the industry. “I believe Animal Science is an interdisciplinary field of study that enables students like me to pursue various career opportunities, ranging from primary animal production to secondary product processing, retail, and quality assurance. This motivates me to be part of the team that will ensure food security for the future generation,” says Ofhani.

Opening doors to a career in Animal Science

The Professor Rob Gous Scholarship for 2020/2021 that was jointly awarded to him and Victor Makofane of the University of Limpopo by the Animal Feed Manufacturers Association (AFMA) of South Africa, is for Ofhani a step closer to realising his dreams. 

“Diligence and hard work have always been the driving force throughout my studies, and I am delighted that my hard work was rewarded. This award further reflects on the Department of Animal Science’s dedication and commitment to build and mentor strong candidates who are recognised by the industry,” he says.

With increasing animal feed costs, the search for more cost-effective feed utilisation techniques – without compromising the nutritive value or feed quality – becomes critically important for intensive broiler producers. 

Ofhani’s study, which aims to evaluate the effect of increasing levels of a nutritional fat emulsifier with a high HLB on the (i) diet digestibility and (ii) production performance of broilers, will provide some insight into the possible energy-saving effect of dietary emulsifiers with a high HBL in broiler diets with moderate lipid inclusion levels. 

“A digestibility study will give more information on the emulsifier effect at metabolic level, and a production study will provide information on growth characteristics and carcass composition.”

An opportunity to compete with other candidates in the industry

“Few studies have been conducted on lipid emulsifiers under South African conditions, which necessitates the need for further research in this field,” he says. 

Ofhani, whose motto in life is to stay humble and accept positive criticism – as it is meant to enlighten you – wants to pursue a career in the animal feed industry. “My qualification will give me an opportunity to compete with other candidates of our generation in the industry, as well as on a research/academic level. By completing my MScAgric, I will broaden my own skill set so that I can continue with industry-related research in the future and provide mentorship to prospective animal scientists,” he adds. 

News Archive

Power interruptions: Information for internal communication
2008-01-31

As part of the UFS’s commitment to address load shedding, the management would like to communicate the following:

The UFS mainly deals with the power interruptions by way of (a) the possible installation of equipment (e.g. generators) and (b) operational arrangements to ensure the functioning of the UFS in spite of power interruptions.

During the past week progress was made on both fronts. The information that follows resulted from a meeting of a task team of Physical Resources led by Mr Nico Janse van Rensburg, which took place on Monday 28 January (this task team naturally focuses on physical solutions) and a discussion by Exco on Wednesday 30 January 2008. Exco discussed the recommendations of the mentioned task team in respect of physical aspects, as well as the operational arrangements proposed by faculties.

Physical solutions

A Main Campus

1. New emergency power installations already approved:

Last week Exco gave its approval for the design and installation of emergency power equipment in all the large lecture-hall complexes to proceed immediately.

In all these cases

  • load surveys have been completed and a start has been made with the ordering of equipment and the process of appointing contractors. (Exco approved the adjustment of normal tender procedures in an attempt to expedite completion.)
  • generators with 20-30% more capacity than required for the current load are being ordered.
  • provision is being made for the connection of lights and at least one wall plug to the emergency power.
  • the expected construction time is 16 weeks (except in the case of the Flippie Groenewoud Building where it is 6 weeks).

The above-mentioned concerns lecture halls/ venues in the following buildings: Examination Centre, Flippie Groenewoud Building, Stabilis, Genmin and the Agriculture Building.

As far as the Agriculture Building is concerned, a larger generator (larger than required for lecture venues only) is being ordered in view of simultaneously providing essential research equipment (refrigerators, ovens, glasshouses) with emergency power within 16 weeks.

2. Investigation into the optimal utilisation of present emergency power installations

All the emergency power systems are being investigated on the basis of a list compiled in 2006 to determine whether excess capacity is available and whether it is possible to connect additional essential equipment or lights to it.

The electrical engineer warns as follows:
“Staff members must under no circumstances overload present emergency power points.

A typical example of this is a laboratory with 10 power points of which 2 points are emergency power outlets. Normally a fridge and freezer would, for example, be plugged into the two emergency power points, but now, with long load-shedding interruptions, a considerably larger number of appliances are being plugged into the power point by means of multi-sockets and extension cords. In the end the effect of such connections will accumulate at the emergency generator, which will then create a greater danger of it being overloaded and tripping, in other words, no emergency power will then be available.”

3. Requests and needs addressed directly to Physical Resources or reported to Exco via the line managers.

All the physical needs and requests addressed directly to Physical Resources or submitted to Exco via the line managers are being listed, classified and considered technically in view of their being discussed by the task team on Monday 11 February.
The information will (a) lead to recommendations to Exco regarding possible additional urgent emergency power installations, and (b) be used in the comprehensive investigation into the UFS’s preparedness for and management of long power interruptions.

Requests that can easily be complied with immediately and that fit into the general strategy will indeed be dealt with as soon as possible.

4. Purchase of loose-standing equipment: light, small, loose-standing generators, UPSs as solutions to/ aids during power interruptions

Exco approved that

a) faculties and support services accept responsibility themselves for the funding and purchase of loose equipment such as, for example battery lights, should they regard these as essential.
b) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on computer equipment) can (as at present) be purchased from own funds via Computer Services.
c) UPSs (uninterruptible power supplies) that faculties and support services wish to purchase to combat the detrimental effect of unexpected power interruptions on other types of equipment can normally be purchased from own funds with the consent of the line manager concerned.
Note: Please just make sure of the appropriateness of the equipment for a specific situation: it is not a power supply that can bridge a two-hour power interruption.)
d) small, loose-standing generators can be purchased from own funds via Physical Resources and installed under their supervision.
e) laptop computers can , where necessary, be purchased from own budgets. The availability of second-hand laptop computers must be taken into account.

B Vista

No major problems have been reported to date. The situation is being monitored and will be managed according to need. The same guidelines that apply to the Main Campus will naturally also apply to the Vista Campus.

C Qwaqwa

The situation is receiving attentions and solutions have already been found for most problems.

D General

1. All-inclusive project
A comprehensive investigation into the UFS’s preparedness for and management of long power interruptions will be launched as soon as possible. Available capacity will be utilised first to alleviate the immediate need. The needs assessment to which all faculties and support services have already contributed is already an important building block of the larger project.

2. Building and construction projects currently in the planning and implementation phase
The need for emergency power for projects such as the new Computer Laboratory is being investigated proactively and will be addressed in a suitable manner.

3. Liaison with Centlec
Attempts at direct and continuous liaison are continuing in an attempt to accommodate the unique needs of the UFS.

4. HESA meeting and liaison with other universities
A representative of the UFS will attend a meeting of all higher education institutions on 11 February. The meeting is being arranged by HESA (Higher Education South Africa) to discuss the implications for the sector, the management of risks and the sector’s response to government.

5. Internal communication
It is the intention to communicate internally after every meeting of the task team, which will take place on Mondays. Strategic Communication will assist in this regard.


 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept