Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
10 June 2021 | Story Dr Cindé Greyling | Photo Supplied

A brand-new modular space for students was recently completed on the University of the Free State Bloemfontein Campus. The Modular Lecturing Space and Assessment Centre is a bold step to engage with the changing academic environment. It is an example of how collaboration between UFS faculties, the Centre for Teaching and Learning, ICT Services, and University Estates can create cutting-edge and innovative learning and teaching environments.

One space, many functions

The centre, which took 22 months to complete, consists of innovative multi-functional spaces that can be used for large- and small-scale lectures or group work. The biggest venue, which can accommodate up to 980 students, can also be converted into five acoustically separate venues with a variety of table configurations depending on the educational needs. 

In line with the newly adopted blended learning approach, the digital infrastructure in the centre allows for the seamless integration of technology, as all the spaces are equipped with state-of-the-art audio-visual equipment. The computer laboratory and assessment centre, which can accommodate 800 students, can be used for examination or teaching and can be divided into two separate areas if needed. 

Functional study stops 

The centre offers an area where students can pause and study in groups around tables with a laptop-friendly study ledge that runs along the length of the space. Sufficient power points allow students to recharge their devices in an aesthetically pleasing space that promotes optimal engagement with learning. 

The design brief for this multifunctional space was a collaborative effort between professionals and UFS departments to ensure the most efficient use of space and purpose. The overall focus was on effectiveness and efficiency, which is part of University Estates’ strategy to maximise the use of space.

More to this than meets the eye

The building integrates into its environment with waterwise gardens and numerous indigenous trees planted around the permanent outdoor seating, which can also be used as informal learning spaces. The landscaping is seamlessly accessible with ramps and tactile paving. 

Modern, fully inclusive ablution facilities can accommodate high volumes of traffic, and rainwater is collected in 44 tanks with a capacity of 79 000 litres for watering the landscape, as well as emergency water supply to flush water closets. Heat pump air-conditioning systems with individual control for each room are connected to the campus building management system for effective energy control. 

Further expansion

Phase 2 of the project will entail a 24/7 study space that will accommodate 250 students. The venue will also provide a small recreation area. Completion is scheduled for December 2021.

Although the project team was faced with COVID-19 restrictions during construction, they managed to complete the building within the agreed budget and quality measures. The team is looking forward to creating more functional spaces on the UFS campuses. 

Take a tour of the new Modular Lecturing Space and Assessment Centre Building:

News Archive

UFS staff get salary adjustment of 13,35%
2008-11-13

 

At the signing of the salary agreement were, from the left: Prof. Johan Grobbelaar, Chairperson of UVPERSU, Prof. Teuns Verschoor, Acting Rector of the UFS, and Ms Senovia Welman, Chairperson of NEHAWU.
Photo: Anita Lombard

UFS staff get salary adjustment of 13,35%

The University of the Free State’s (UFS) management and trade unions have agreed on an improvement in the service benefits of staff of 16,55% for 2009. This includes a general salary adjustment of 13,35% (according to the estimated government subsidy that will be received in 2009).

“The negotiating parties agreed that adjustments could vary from a minimum of 13,00%, or more, depending on the government subsidy and the model forecasts. If the minimum of 13,00% is not affordable, the parties will re-negotiate,” said Prof. Teuns Verschoor, Acting Rector of the UFS.

“The negotiations were conducted in a positive spirit and the parties are in agreement that it is an exceptionally good adjustment – being higher than for example the increase in medical premiums,” said Prof. Verschoor.

The agreement was signed yesterday by representatives of the UFS management and the trade unions, UVPERSU and NEHAWU.

An additional once-off non-pensionable bonus of R3 390 will also be paid to staff later this year.

The bonus will be paid to all staff members who were in the employ of the UFS on UFS conditions of service on 10 November 2008 and who assumed duties before 1 October 2008. This includes all former Vista staff, regardless of whether they have already been aligned with UFS conditions of service.


The bonus is payable in recognition of the role played by staff during the year to promote the UFS as a university of excellence and as confirmation of the role and effectiveness of the remuneration model.

“It is important to note that this bonus can be paid due to the favourable financial outcome of 2008,” said Prof. Verschoor.

It is the intention to pass the maximum benefit possible on to staff without exceeding the limits of financial sustainability of the institution. For this reason, the negotiating parties reaffirmed their commitment to the Multiple-year Income-related Remuneration Improvement Model used as a framework for negotiations. The model and its applications are unique and has as a point of departure that the UFS must be and remain financially sustainable.

Additional funding (0,70%) was also negotiated. This will be allocated on 1 January 2009 to accelerate the phasing-in of medical benefits and, if possible, to finalise the phasing-in process. Agreement was reached that 2,50% will be allocated for growth in capacity building to ensure that provision is made for the growth of the UFS over the last few years, as well as the incorporation of Vista staff.

The agreement also applies to all staff members of the two above-mentioned campuses whose conditions of employment have already been aligned with those of the Main Campus.

The implementation date for the salary adjustment is 1 January 2009. The adjustment will be calculated on the total remuneration package.

In 2008, a total improvement of service benefits of 9,32% and a salary adjustment of 7,52% were paid to employees. Staff received a once-off non-pensionable bonus of R3 000 at the end of 2007.

Media Release
Issued by: Lacea Loader
Assistant Director: Media Liaison
Tel: 051 401 2584
Cell: 083 645 2454
E-mail: loaderl.stg@ufs.ac.za  
12 November 2007
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept