Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
10 June 2021 | Story Dr Cindé Greyling | Photo Supplied

A brand-new modular space for students was recently completed on the University of the Free State Bloemfontein Campus. The Modular Lecturing Space and Assessment Centre is a bold step to engage with the changing academic environment. It is an example of how collaboration between UFS faculties, the Centre for Teaching and Learning, ICT Services, and University Estates can create cutting-edge and innovative learning and teaching environments.

One space, many functions

The centre, which took 22 months to complete, consists of innovative multi-functional spaces that can be used for large- and small-scale lectures or group work. The biggest venue, which can accommodate up to 980 students, can also be converted into five acoustically separate venues with a variety of table configurations depending on the educational needs. 

In line with the newly adopted blended learning approach, the digital infrastructure in the centre allows for the seamless integration of technology, as all the spaces are equipped with state-of-the-art audio-visual equipment. The computer laboratory and assessment centre, which can accommodate 800 students, can be used for examination or teaching and can be divided into two separate areas if needed. 

Functional study stops 

The centre offers an area where students can pause and study in groups around tables with a laptop-friendly study ledge that runs along the length of the space. Sufficient power points allow students to recharge their devices in an aesthetically pleasing space that promotes optimal engagement with learning. 

The design brief for this multifunctional space was a collaborative effort between professionals and UFS departments to ensure the most efficient use of space and purpose. The overall focus was on effectiveness and efficiency, which is part of University Estates’ strategy to maximise the use of space.

More to this than meets the eye

The building integrates into its environment with waterwise gardens and numerous indigenous trees planted around the permanent outdoor seating, which can also be used as informal learning spaces. The landscaping is seamlessly accessible with ramps and tactile paving. 

Modern, fully inclusive ablution facilities can accommodate high volumes of traffic, and rainwater is collected in 44 tanks with a capacity of 79 000 litres for watering the landscape, as well as emergency water supply to flush water closets. Heat pump air-conditioning systems with individual control for each room are connected to the campus building management system for effective energy control. 

Further expansion

Phase 2 of the project will entail a 24/7 study space that will accommodate 250 students. The venue will also provide a small recreation area. Completion is scheduled for December 2021.

Although the project team was faced with COVID-19 restrictions during construction, they managed to complete the building within the agreed budget and quality measures. The team is looking forward to creating more functional spaces on the UFS campuses. 

Take a tour of the new Modular Lecturing Space and Assessment Centre Building:

News Archive

UFS closes pedestrian entrances to improve safety on campus
2010-08-05

The University of the Free State (UFS) will remove pedestrian gates on its Main Campus in an extra effort to improve safety on this campus.

It was decided to implement this plan because the campus covers a huge area and people who are not part of the campus community hang around on the campus, sometimes causing damages. This idea is also strongly supported by students, in particular with regard to the removal of the pedestrian thoroughfares close to the hostels.

The following pedestrian gates will not be removed:

- The pedestrian thoroughfares on both sides of the DF Malherbe Gate (next to the Faculty of Health Sciences). Both the main gate and the pedestrian thoroughfares at the DF Malherbe Gate remain open 24 hours a day.
- The pedestrian thoroughfares at the Badenhorst Street Gate (close to Roosmaryn Residence). The Badenhorst Gate is not open 24 hours a day, but the pedestrian thoroughfare will remain open 24 hours a day.

The following pedestrian thoroughfares will be removed with effect from 1 September 2010:

- The pedestrian thoroughfare to the east of Pellies Park
- The pedestrian thoroughfare to the west of Pellies Park (directly behind JMB Hertzog Residence)
- The turnstile between the Kovsie Church and the Wynand Mouton Gate
- The pedestrian thoroughfare behind the tennis courts
- The pedestrian thoroughfares behind the rugby fields

A request was also directed at the Kovsie Church to close down the pedestrian thoroughfare between the Kovsie Church and the UFS. This gate will then be opened during church activities.

From 1 September 2010, the personnel of Security Services will regularly patrol the fences. Trespassers that flatten the fencing to enter the campus will be prosecuted.

Students, personnel and visitors are encouraged to make use of the main entrance gates of the UFS. These include the Main Gate (in Nelson Mandela Drive), the Wynand Mouton Gate (in DF Malherbe Drive), the DF Malherbe Gate (in Wynand Mouton Drive), the Badenhorst Street Gate (close to Roosmaryn Residence) and the Furstenburg Gate (in Furstenburg Road).

Media Release:
Mangaliso Radebe
Assistant Director: Media Liaison
Tel: 051 401 2828
Cell: 078 460 3320
E-mail: radebemt@ufs.ac.za
5 August 2010

 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept