Latest News Archive

Please select Category, Year, and then Month to display items
Previous Archive
10 June 2021 | Story Dr Cindé Greyling | Photo Supplied

A brand-new modular space for students was recently completed on the University of the Free State Bloemfontein Campus. The Modular Lecturing Space and Assessment Centre is a bold step to engage with the changing academic environment. It is an example of how collaboration between UFS faculties, the Centre for Teaching and Learning, ICT Services, and University Estates can create cutting-edge and innovative learning and teaching environments.

One space, many functions

The centre, which took 22 months to complete, consists of innovative multi-functional spaces that can be used for large- and small-scale lectures or group work. The biggest venue, which can accommodate up to 980 students, can also be converted into five acoustically separate venues with a variety of table configurations depending on the educational needs. 

In line with the newly adopted blended learning approach, the digital infrastructure in the centre allows for the seamless integration of technology, as all the spaces are equipped with state-of-the-art audio-visual equipment. The computer laboratory and assessment centre, which can accommodate 800 students, can be used for examination or teaching and can be divided into two separate areas if needed. 

Functional study stops 

The centre offers an area where students can pause and study in groups around tables with a laptop-friendly study ledge that runs along the length of the space. Sufficient power points allow students to recharge their devices in an aesthetically pleasing space that promotes optimal engagement with learning. 

The design brief for this multifunctional space was a collaborative effort between professionals and UFS departments to ensure the most efficient use of space and purpose. The overall focus was on effectiveness and efficiency, which is part of University Estates’ strategy to maximise the use of space.

More to this than meets the eye

The building integrates into its environment with waterwise gardens and numerous indigenous trees planted around the permanent outdoor seating, which can also be used as informal learning spaces. The landscaping is seamlessly accessible with ramps and tactile paving. 

Modern, fully inclusive ablution facilities can accommodate high volumes of traffic, and rainwater is collected in 44 tanks with a capacity of 79 000 litres for watering the landscape, as well as emergency water supply to flush water closets. Heat pump air-conditioning systems with individual control for each room are connected to the campus building management system for effective energy control. 

Further expansion

Phase 2 of the project will entail a 24/7 study space that will accommodate 250 students. The venue will also provide a small recreation area. Completion is scheduled for December 2021.

Although the project team was faced with COVID-19 restrictions during construction, they managed to complete the building within the agreed budget and quality measures. The team is looking forward to creating more functional spaces on the UFS campuses. 

Take a tour of the new Modular Lecturing Space and Assessment Centre Building:

News Archive

UFS academics work on text book about legal requirements for cultural institutions
2010-11-09

Prof. Johan Henning, Dean of the Faculty of Law, UFS; Prof. Loot Pretorius, also from the Faculty of Law; and Mr Tokkie Pretorius, Director of the War Museum in Bloemfontein.

A team consisting of Prof. Johan Henning, Dean of the Faculty of Law at the University of the Free State (UFS), Prof. Loot Pretorius, also from the Faculty of Law, and Mr Tokkie Pretorius, Director of the War Museum, is going to tackle a project which will focus on the new legal requirements for cultural institutions, with special reference to national museums.

Previously this team has written a textbook on the legal position of development corporations, which is regarded as a standard work about this topic.

Museum managers often come from the expert conservation and research environment and find it difficult to comply with the new legal requirements pertaining to national museums.

National museums, amongst which counts the War Museum of the Boer Republics, are classified by the Public Finance Management Act (PFMA) no. 1 of 1999 as Public Entities.

This Act also states specific accounting requirements regarding the accounting standards, year-end statements and the auditing process on the one hand, but on the other hand specific requirement with regard to corporate management.

The King II Report and it most recent extension, King III, sets specific guidelines to be followed in the managerial process and specifically emphasises the role and responsibilities of non-executive boards of directors (board members) and those of the executive director (chief executive officer). The Cultural Institutions Act, no. 119 of 1998, regulates the operation of national museums, amongst others the constitution and functions of the boards of national museums. Various other forms of legislation also apply to national museums.

According to Prof. Pretorius they aim to publish the book within the next 18 months.
 

We use cookies to make interactions with our websites and services easy and meaningful. To better understand how they are used, read more about the UFS cookie policy. By continuing to use this site you are giving us your consent to do this.

Accept